Geotechnical Investigations for Construction of NADRA Headquarters Building at Plot No. 57-B, Blue Area, F-6, Islamabad
ποΈ Issuing Authority:National Engineering Services Pakistan (Pvt.) Limited (NESPAK)
Expired Tender
β° Closing Date:
2025-12-31
2025-12-31
Tender Overview
- π Category
- Construction & Civil Works Materials / Consultancy
- π Sector
- Works
- π Tender Type
- Works
- π Source Name
- PPRA
Location & Dates
- π City
- Islamabad
- πΊοΈ Province
- Islamabad Capital Territory
- π Country
- Pakistan
- π Publish Date
- 2025-12-13
- β³ Closing Date
- 2025-12-31
- π Created At
- 2025-12-13 06:23:57
Contact & Websites
- π Contact Phone
- 051-9221910-13
Actions
π₯ Download Tender Document
β¬
οΈ Back to All Tenders
Looking for more tenders like this?
View all active Construction & Civil Works Materials tenders.
Related Tenders
Fabrication of Solid Waste Machinery for TMA Rustam
Close: 2026-03-31
Rustam, Khyber Pakhtunkhwa
Rehabilitation and Installation of Solar and Electric Street Lights in Mardan
Close: 2026-04-07
Mardan, Khyber Pakhtunkhwa
Accelerated Sustainable Development Initiative Water Supply and Sewerage Works in District Battagram...
Close: 2026-04-03
Battagram, Khyber Pakhtunkhwa
Pavement and Drain Improvement Works at Kotka Anwar Ali Shah and Khalid...
Close: 2026-04-18
Bannu, Khyber Pakhtunkhwa
Construction of Flood Protection and Irrigation Channels in Chitral District
Close: 2026-04-10
Chitral, Khyber Pakhtunkhwa
Construction of Flood Protection and Flow Management Works in Lower and Upper...
Close: 2026-04-09
Chitral, Khyber Pakhtunkhwa
Tender Document
Tender Description
This tender invites qualified contractors to perform comprehensive geotechnical investigations for the construction of the NADRA Headquarters building located at Plot No. 57-B, Blue Area, F-6, Islamabad. The scope includes field investigations such as borehole drilling, soil and rock sampling, standard penetration tests, and laboratory testing of collected samples.
The work also encompasses preparation of a detailed geotechnical investigation report with recommendations on footing types, bearing capacities, and excavation support systems. The contract requires experienced personnel, specialized equipment, and adherence to health, safety, and environmental standards.
