Shifting of Power Supply from Deteriorated LV Switchgear to Separate Distribution Panel at Sub-Station West JTC Jinnah International Airport Karachi
ποΈ Issuing Authority:Pakistan Airports Authority (PAA)
Expired Tender
β° Closing Date:
2025-12-12
2025-12-12
Tender Overview
- π Category
- Construction & Civil Works Materials / Electrical Installation Works
- π Sector
- Works
- π Tender Type
- Works
- βοΈ Procurement Method
- Single Stage Two Envelope Procedure
- π¨ Submission Method
- Online portal with physical submission of bid security
- π° Estimated Cost
- Rs. 50,000/-
- π Source Name
- PPRA
Location & Dates
Contact & Websites
- π€ Contact Person
- Engr. Wasim Ahmed, Sr. Joint Director (Electrical) JIAP
- π Contact Phone
- 021-99071316
- π Website
- http://eprocure.gov.pk
- π Original Source
- http://eprocure.gov.pk
Actions
π₯ Download Tender Document
π View Original Advertisement
β¬
οΈ Back to All Tenders
Looking for more tenders like this?
View all active Construction & Civil Works Materials tenders.
Related Tenders
Fabrication of Solid Waste Machinery for TMA Rustam
Close: 2026-03-31
Rustam, Khyber Pakhtunkhwa
Rehabilitation and Installation of Solar and Electric Street Lights in Mardan
Close: 2026-04-07
Mardan, Khyber Pakhtunkhwa
Accelerated Sustainable Development Initiative Water Supply and Sewerage Works in District Battagram...
Close: 2026-04-03
Battagram, Khyber Pakhtunkhwa
Pavement and Drain Improvement Works at Kotka Anwar Ali Shah and Khalid...
Close: 2026-04-18
Bannu, Khyber Pakhtunkhwa
Construction of Flood Protection and Irrigation Channels in Chitral District
Close: 2026-04-10
Chitral, Khyber Pakhtunkhwa
Construction of Flood Protection and Flow Management Works in Lower and Upper...
Close: 2026-04-09
Chitral, Khyber Pakhtunkhwa
Tender Document
Tender Description
This tender invites bids for the shifting of power supply from a deteriorated low voltage (LV) switchgear to a separate distribution panel at the Sub-Station West JTC located at Jinnah International Airport, Karachi. The scope includes providing and fixing a wall-mounted distribution panel, laying and terminating cables, core drilling for cable passage, and all associated electrical installation works as per Pakistan Airports Authority specifications.
The contract duration is 30 days from the date of written order to commence. Bidders must be registered with the Pakistan Engineering Council in at least C-6 category with EE-04 code. The bidding process is conducted electronically via the PPRA EPADS portal, with physical submission of bid security required. The contract includes strict compliance with safety, quality, and technical standards, and the contractor is responsible for all tools, materials, and labor required for execution.
