Design, Supply and Installation of Aerial Bundled Conductor Cable with Accessories for LESCO
π Tender No: ADB-EPC-003-LESCO-2025
ποΈ Issuing Authority:Lahore Electric Supply Company Limited
Expired Tender
β° Closing Date:
2026-01-15
2026-01-15
Tender Overview
- π Category
- Electrical & Solar Equipment / Power
- π Sector
- Works
- π Tender Type
- Works
- π¨ Submission Method
- Sealed hard copy
- π Source Name
- PPRA
Location & Dates
Contact & Websites
- π Contact Phone
- 042-9214410
- βοΈ Contact Email
- cedev@lesco.gov.pk
Actions
π₯ Download Tender Document
β¬
οΈ Back to All Tenders
Looking for more tenders like this?
View all active Electrical & Solar Equipment tenders.
Related Tenders
Supply and Installation of Electric Motors, Generators, and Electrical Materials for Disposal...
Close: 2026-04-03
Larkano, Sindh
Provide and Supply of Maintenance Free VRLA UPS Batteries
Close: 2026-04-03
Karachi, Sindh
Installation of Solar Power Systems and E-Library at District & Sessions Court...
Close: 2026-04-06
Tando Allahyar, Sindh
Installation of Solar Power Systems and E-Library at District & Sessions Court...
Close: 2026-04-06
Tando Allahyar, Sindh
Construction of Drainage Scheme Village Allah Rakhyo Pathan District Tando Allahyar
Close: 2026-04-06
Tando Allahyar, Sindh
Construction of Drainage Scheme Village Ditto Kalroo District Tando Allahyar with Solar...
Close: 2026-04-06
Tando Allahyar, Sindh
Tender Document
Tender Description
This tender invites bids for the design, manufacture, supply, installation, laying, testing, commissioning, and energization of Aerial Bundled Conductor (ABC) cable with complete allied accessories. The project covers approximately 1,328 km of high loss feeders in selected areas under LESCO on an EPC/turnkey basis.
The contract includes comprehensive scope from plant design to final energization, ensuring quality and performance standards. The bid submission deadline is 15th January 2026 at 11:00 AM, with bid opening scheduled for 11:30 AM the same day. The standstill period after award notification is 14 days.
