WhatsApp Chat

Supply of Induction Furnace for Melting of Gold and Silver

📌 Tender No: Proc.21.(Cost of Stores)/T-27/2025-2026
🏛️ Issuing Authority:Pakistan Mint
Active Tender
⏰ Closing Date:
2026-04-14

Tender Document

Tender Description

This tender from Pakistan Mint Lahore invites bids for the supply of induction furnaces designed specifically for melting gold and silver. The procurement falls under the Power, Electrical & Solar Equipment category, reflecting the technical nature of the equipment required for precious metal processing in Lahore. The scope includes supplying two units of induction furnaces with a melting capacity of 15 Kg or above for gold, operating on 3 Phase 50/60 Hz power input with a voltage of 380 ± 40 volts. The furnaces must feature IGBT power devices, a minimum temperature requirement of 1400 °C, and compatible crucibles made of high purity graphite or silicon carbide. Additional accessories such as crucible tongs, feeding spoons, and an industrial water chiller for cooling are also part of the supply. The equipment must ensure safe and easy pouring with a built-in tilting mechanism, suitable for the technical demands of metal melting at Pakistan Mint. Bidders should ensure compliance with PEC categories relevant to electrical equipment supply and maintain active taxpayer status with FBR, including ATL listing for the fiscal year 2025-26. The tender requires submission of earnest money in the form of a Call Deposit Receipt (CDR) or bank guarantee, valid for at least 180 days. Technical and financial bids will be evaluated under the Least Cost Based Selection (LCBS) method, emphasizing both compliance and cost-effectiveness. The submission deadline is set for 14th April 2026 at 10:00 AM, with technical bids opening at 10:30 AM the same day. Bidders must submit sealed bids physically to the Procurement Officer at Pakistan Mint, GT Road, Lahore. Financial bid opening will be announced later. Pro-Tip: Carefully review the technical specifications and ensure samples of the brand quoted are provided with the technical proposal. Missing samples or incomplete documentation can lead to outright rejection. Also, confirm the validity of your bid security and ensure it meets the 180-day requirement to avoid disqualification.
Scroll to Top

Continue Browsing

Mazeed tenders dekhte rehne ke liye number enter kar ke continue karein.

Verify on WhatsApp