Installation, Testing and Commissioning of Backup Pump at Peshawar Aviation Facility
Tender No: AM-19872AS
Active Tender
Closing Date:
2026-08-18
2026-08-18
Tender Overview
- Category
- Construction & Civil Works / Electrical Works & Equipment / Hardware & Tools / Mechanical Works & Equipment
- Sector
- Works
- Tender Type
- Works
- Procurement Method
- Request for Quotation
- Submission Method
- Quotation submission method and address are not specified in the notice; quotation is required for all listed items by the stated deadline.
- Source Name
- PPRA
Location & Dates
- City
- Peshawar
- Province
- Khyber Pakhtunkhwa
- Country
- Pakistan
- Publish Date
- 2026-08-06
- Closing Date
- 2026-08-18
- Created At
- 2026-08-06 19:58:45
Contact & Websites
- Contact Phone
- (021) 9203866-85
Actions
Download Tender Document
Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Renovation of RM Office at PSO House Islamabad
Close: 2026-08-18 Islamabad, Islamabad Capital Territory
Upgradation of Class-II Level Crossing and RCC Watch Towers at Quetta
Close: 2026-08-22 Quetta, Balochistan
Addition of 02 Nos. 220kV Line Bays at Existing 220/132kV Grid Station...
Close: 2026-08-24 Rahim Yar Khan, Punjab
Construction of Class-I Manned Level Crossing at KM 336/9-10, Dozan Station Yard,...
Close: 2026-08-24 Quetta, Balochistan
Special Maintenance Work for Construction of Steel Overhead Pedestrian Bridge with Motorcycle...
Close: 2026-08-25 Matiari, Sindh
Hill Slope Stability Measures and Road Protection Works on N-75
Close: 2026-08-27 Muzaffarabad, Azad Jammu & Kashmir (AJK)
Tender Document
Tender Description
Pakistan State Oil Company Limited (PSO) requests quotations for installation, testing and commissioning of a backup fuel-delivery pumping system at the Peshawar Aviation Facility. The RFQ covers supply, mechanical, electrical, civil, testing and maintenance activities, with all rates inclusive of applicable duties, taxes and transportation. **Deadline: 2026-08-18 23:59:59.**
Mandatory item and lot schedule: 1 miscellaneous steel structure, 1,000 KG; 2 basket strainer, 6 inch, 1 EA; 3 deformed steel bars, 2,000 KG; 4 one-inch gate valves, 3 EA; 5 six-inch gate valves, 4 EA; 6 four-inch non-return valve, 1 EA; 7 and 8 pressure gauges, 3 EA each; 9 one-inch MS pipe, 50 M; 10 three-quarter-inch MS pipe, 3 M; 11 six-by-four-inch reducer, 5 EA; 12 four-by-three-inch reducer, 4 EA; 13 weldolet, 2 EA; 14 sockolet, 2 EA; 15 six-inch flanges, 16 EA; 16 three-way valves, 6 EA; 17 one-inch ball valves, 3 EA; 18 half-inch ball valves, 2 EA; 19 one-inch self-closing ball valves, 2 EA; 20 half-inch self-closing ball valves, 4 EA; 21 two-and-a-half square millimetre cable, 500 M; 22 two-inch GI conduit, 500 M; 23 one-inch GI conduit, 500 M; 24 LT/MCC panel, 1 set; 25 pressure release valve, 1 EA; 26 six-inch MS pipe, 30 EA; 27 four-inch pipe, 10 FT; 28 three-inch pipe, 10 FT; 29 six-inch 90-degree elbows, 7 EA; 30 half-inch pipe, 3 M; 31 six-inch 45-degree elbows, 2 EA; 32 three-inch 90-degree elbows, 2 EA; 33 weldolets, 3 EA; 34 four-inch flanges, 8 EA; 35 three-inch flanges, 5 EA; 36 35-square-millimetre cable, 500 M; 37 explosion-proof switch, 1 EA; 38 and 39 six-inch elbows, 25 and 20 degrees, 1 EA each; 40 lateral tee and 41 equal tee, 1 EA each.
Lot 42 contains the integrated works: 42.01 backup pump installation; 42.02 pump repair; 42.03 paver removal, 10 M2; 42.04 dismantling; 42.05 excavation, 20 M3; 42.06 lean concrete, 5 M3; 42.07 reinforcement, 2,000 KG; 42.08 RCC, 20 M3; 42.09 steel fabrication, 1,000 KG; 42.10 paver laying, 10 M2; 42.11 pump and motor installation; 42.12 strainer installation; 42.13-42.17 valve and gauge installation; 42.18-42.23 pipe laying; 42.24 three-way valve installation; 42.25 ball-valve installation; 42.26 cable laying, 3,280 FT; 42.27 motor-control panel; 42.28 explosion-proof buttons; 42.29 earthing pit; 42.30 commissioning; 42.31 pipeline quantity determination; and 42.32 pipeline cleaning and painting, 1,500 M2.
Bidders should submit a complete quotation for all specifications, observe OEM, API, ASME, ASTM and HSE requirements, provide genuine materials, certificates, warranty and a 300-day completion commitment. A site visit is mandatory, and entry-pass documentation must be arranged in advance. Earnest money fields are blank; confirm applicable security and submission instructions with PSO before quoting. **Department: Pakistan State Oil Company Limited (PSO).**