WhatsApp Chat

Supply, Installation, Testing and Commissioning of CCTV System (13 Cameras) at LMT Korangi Phase 2

πŸ“Œ Tender No: LM-19598KZ
πŸ›οΈ Issuing Authority:Pakistan State Oil (PSO)
Active Tender
⏰ Closing Date:
2026-04-17

Tender Overview

πŸ“‚ Category
Construction & Civil Works Materials / Electrical & Solar Equipment / Electronics & Appliances / Power
🏭 Sector
Works
πŸ“„ Tender Type
Works
βš™οΈ Procurement Method
Request for Quotation
πŸ“¨ Submission Method
Sealed hard copy
🌐 Source Name
PPRA

Location & Dates

πŸ“ City
Karachi
πŸ—ΊοΈ Province
Sindh
🌍 Country
Pakistan
πŸ“… Publish Date
2026-04-07
⏳ Closing Date
2026-04-17
πŸ•’ Created At
2026-04-07 09:57:06

Contact & Websites

πŸ“ž Contact Phone
(021) 9203866-85

Tender Document

Tender Description

This tender invites qualified contractors in Karachi to supply, install, test, and commission a CCTV system comprising 13 cameras at LMT Korangi under Pakistan State Oil (PSO). The procurement covers advanced surveillance equipment and related civil works. The scope includes supplying 4MP IP bullet cameras with night vision, network switches, data cables, relay control boxes, and a network video recorder. Installation involves laying power and camera cables using PVC pipes and flexible conduits, excavation, trenching, and backfilling where necessary. The contractor must ensure proper earthing and compliance with HSE standards while deploying trained personnel for installation and post-installation monitoring. Bidders should hold relevant PEC categories and maintain active FBR/ATL status for the fiscal year 2025-26. It is advisable to prepare a Call Deposit Receipt (CDR) as Earnest Money and ensure all documentation aligns with PSO's procurement policies. Familiarity with technical bid preparation and adherence to brand specifications or approved equivalents is essential. The submission deadline is set for 23:59:59 on 17 April 2026, with bids to be delivered to PSO House, Khayaban-e-Iqbal, Clifton, Karachi. The technical and financial bids will be opened as per PSO's schedule. Contractors should plan accordingly to meet the timeline and ensure all required documents are complete. Pro-Tip: Carefully review the newspaper advertisement for any specific stamp duty or Earnest Money requirements, as these are often overlooked and can lead to disqualification. Also, confirm the brand equivalency approvals early to avoid delays during evaluation.
Scroll to Top

Continue Browsing

Mazeed tenders dekhte rehne ke liye number enter kar ke continue karein.

Verify on WhatsApp