0 Trusted Subscribers
0 Tenders Listed
Daily Updates
Rehabilitation of Existing Building at PSO-87 Sindh FS, Karachi Division
Tender No: RFQ No RC-19891AM
Expired Tender
Closing Date:
2026-09-01
2026-09-01
Tender Overview
- Category
- Building Maintenance / Construction & Civil Works / Electrical Works & Equipment
- Sector
- Works
- Tender Type
- Works
- Source Name
- PPRA
Location & Dates
Contact & Websites
- Contact Phone
- (021) 9203866-85
Actions
Back to All Tenders
Looking for more tenders like this? View all active Building Maintenance tenders.
Related Tenders
Rehabilitation, Renovation, and Repair Works for MEPCO Transmission Lines and Sub Division...
Close: 2026-10-21 Multan, Punjab
Procurement of Contractor Services for Paint Works of PIDC Building Regional Office...
Close: 2026-10-22 Islamabad, Islamabad Capital Territory
Annual Maintenance and Operation of Electrical, Plumbing, and Allied Works at Central...
Close: 2026-11-09 Karachi, Sindh
Provision and Maintenance Works at Karachi and NAS Turbat Naval Facilities
Close: 2026-10-21 Karachi, Sindh
Construction of SECP Head Office Building Mauve Area G-11 Islamabad (Package -2A...
Close: 2026-11-04 Islamabad, Islamabad Capital Territory
Supply and Installation of Building Works for Govt College Education Projects in...
Close: 2026-10-19 Hyderabad, Sindh
Tender Description
Pakistan State Oil Company Limited (PSO) invites quotations for the Rehabilitation of Existing Building at PSO-87 Sindh FS, Karachi Division. This project involves comprehensive civil, electrical, plumbing, and finishing works to restore and upgrade the existing kiosk building and associated facilities.
Items being procured:
- Preparatory works including dismantling of existing roof slab, tiles, sanitary items, electrical wiring, aluminum windows and doors, fiber tanks, plumbing items
- Pouring of new RCC roof slab and roof beams with parapet wall masonry
- Supply and installation of deformed steel bars and concrete joint treatment
- Internal and external plastering works
- Block/brick masonry
- Complete painting works including distemper, matt finish, weather shield, and enamel paint
- Supply and installation of 4" UPVC pipes for roof drainage
- Electrical works including wiring, installation of LED lights, fans, switches, sockets, and commissioning
- Supply and installation of aluminum composite material (ACM) sheets on elevations
- Supply and installation of false ceiling (POP)
- Roof screeding and waterproofing including bitumen coating and pea gravel laying
- Renovation works including tile work, sanitary and plumbing, drainage, bathroom renovation, doors and windows works
- Supply and installation of fiber tanks (2 nos. 500 gallons)
- Plumbing works including wash basins, water closets, shower arrangements, pipes, valves, and toilet accessories
- Construction of carwash drain channel and steel louvers door for DB room
The scope covers all materials, labor, tools, equipment, and site management as per PSO standards and drawings. The contractor must ensure safety compliance, obtain necessary permissions from local authorities, and coordinate with the Engineer Incharge for approvals and inspections. All dismantled materials like steel bars belong to the contractor, while sanitary and aluminum materials remain PSO property and must be secured for reuse or shifted to PSO stores.
Eligibility requires relevant PEC category registration, FBR/ATL compliance, and minimum 5 years of experience for site engineers and 3 years for HSE supervisors. Contractors must submit detailed project schedules, manpower and equipment lists, CVs of key personnel, and samples of materials for approval. The completion time is 75 calendar days including mobilization.
Bidders should carefully visit the site before quoting and ensure all technical and commercial details are included in their bids. Special attention to PSO HSE requirements and site cleanliness is mandatory. The bid submission deadline is 01 September 2026. This is a valuable opportunity for contractors experienced in civil rehabilitation and electrical works in Karachi.
A practical tip for bidders: Prioritize early coordination with PSO site Incharge and local authorities to avoid delays in permissions and approvals, which can impact the tight project timeline.
