Remodeling and Renovation of Masjid-e-Khizra with Allied Civil, Electrical, and Drainage Works at PSO House Karachi
Tender No: RFQ No RC-19847SR
Active Tender
Closing Date:
2026-08-13
2026-08-13
Tender Overview
- Category
- Chemicals & Industrial Materials / Construction & Civil Works / Electrical Works & Equipment / Water Supply & Sanitation
- Sector
- Works
- Tender Type
- Works
- Procurement Method
- Request for Quotation
- Submission Method
- Physical Submission
- Source Name
- PPRA
Location & Dates
Contact & Websites
- Contact Phone
- (021) 9203866-85
Actions
Download Tender Document
Back to All Tenders
Looking for more tenders like this? View all active Chemicals & Industrial Materials tenders.
Related Tenders
Procurement of Electrical Items, Pipes and Strainer for ZTBL Head Office Islamabad
Close: 2026-08-17 Islamabad, Islamabad Capital Territory
Procurement of 23 Expendable Items for IGM Welding Robotic Station
Close: 2026-08-20 Taxila, Punjab
Procurement of Electrical and Mechanical Equipment for Pakistan State Oil Limited Karachi
Close: 2026-08-13 Karachi, Sindh
Supply of Agricultural Seeds, Fertilizers, and Pesticides for Headquarter Mill Farms Okara
Close: 2026-08-20 Okara, Punjab
Supply of Electrical and Mechanical Spares, Foundry, Oil and Lubricants
Close: 2026-08-17 Wah Cantt, Punjab
Supply of Electrical and Mechanical Spares, Foundry & Refractory Stores, Oil and...
Close: 2026-08-17 Wah Cantt, Punjab
Tender Document
Tender Description
Pakistan State Oil Company Limited (PSO) Karachi invites qualified contractors for the remodeling and renovation of Masjid-e-Khizra located at PSO House, Khayaban-e-Iqbal, Clifton, Karachi. This comprehensive project involves allied civil, electrical, and drainage works to upgrade the existing infrastructure and facilities.
Items being procured:
- Steel canopy conversion (1200 SFT)
- Construction of pump island (36 RFT)
- Construction of RCC pit and installation of 25KL UGFS tank (1 EA)
- UPP fuel pipeline 54 mm dia (300 M)
- Decanting GI pipe 3" dia (30 RFT)
- Guard rail at fill point (25 RFT)
- Providing and laying 60mm thick precast concrete pavers (5500 SFT)
- Providing and fixing curb stone (200 RFT)
- Providing and constructing cut off drain (130 RFT)
- Excavation (2 M3)
- Earth/back filling (2 M3)
- Lean concrete 1:4:8 (2 M3)
- Laying RCC 1:2:4 (15 M3)
- Supply and installation of deformed steel bars (300 KG)
- Plain plaster 1/2" thick (170 M2)
- Plain plaster 3/4" thick (60 M2)
- Brick/block masonry (25 M3)
- Plastic emulsion paint (180 M2)
- Weather shield paint (160 M2)
- Wiring for spreader (250 RFT)
- Wiring for DU & motor (300 RFT)
- Supply and installation of 1-HP centrifugal pump (1 EA)
- Providing and laying UPVC pipes of various diameters (100 RFT 8", 20 RFT 6", 50 M 4", 25 RFT 2")
- Asphalt laying (1000 SFT)
- Installation of LED lights (15 EA)
- Supply and installation of ACM sheets (1600 SFT)
- Providing and laying lube bay drain (26 RFT)
- Construction of grease pit (1 EA)
- Installation of hoist in car wash (2 EA)
- Steel structure fabrication (500 KG)
- Design consultancy for steel structure canopy (1 EA)
- Relaying pavers (100 SFT)
- Construction of manholes (8 EA 2'x2'x2', 6 EA 1.5'x1.5'x1.5')
- Renovation of existing tyre shop with allied electrical works (1 JOB)
- Porcelain tile works (3000 SFT)
- Electrical works including wiring, DBs, lighting, earthing (1 JOB)
- Supply and installation of false ceiling (250 FT2)
- Miscellaneous services including synthetic enamel paint, doors & windows, fiber water tank installation (1 JOB)
- Building roof waterproofing (100 M2)
- Plumbing services including wash basins, commodes, pipes, valves, and accessories (1 JOB)
The technical scope covers structural modifications including raising the steel canopy height to 20ft with solar system provision, fabrication and installation of steel structures, false ceiling, GI corrugated sheets, plumbing with UPVC pipes, construction of pump island, RCC pits, installation of underground fuel storage tanks, electrical wiring and lighting, paving, drainage, and roofing waterproofing. The project also includes design vetting by a PEC-approved consultant with minimum 5 years experience.
Eligibility requires contractors to have relevant PEC categories, FBR/ATL registration, and minimum 5 years of experience. Contractors must submit CVs of site engineers and HSE supervisors with required training certificates. Prior site visit is mandatory. The project duration is 110 calendar days including mobilization.
The submission deadline is **2026-08-13 23:59:59**. Bids should be submitted to Pakistan State Oil Company Limited, PSO House, Karachi. Earnest Money and CDR requirements apply as per PSO instructions. Contractors should provide detailed material procurement and project schedules along with manpower and equipment deployment plans.
A practical tip for bidders: Ensure all offered materials comply with PSO specifications and provide complete technical and commercial documentation including test reports and samples for equivalency approval. Early site visits and thorough understanding of the detailed scope will enhance bid accuracy and competitiveness.