Supply and Installation of Reverse Osmosis Plant for Pakistan Aeronautical Complex Kamra
📌 Tender No: PACB/741/42745010/0935/P-1
Expired Tender
⏰ Closing Date:
2026-01-06
2026-01-06
Tender Overview
- 📂 Category
- Construction & Civil Works / Solar & Power Equipment
- 🏭 Sector
- Goods
- 📄 Tender Type
- Goods
- ⚙️ Procurement Method
- Single Stage Two Envelope Basis
- 📨 Submission Method
- Sealed hard copy
- 🌐 Source Name
- PPRA
Location & Dates
Contact & Websites
- 👤 Contact Person
- Asstt Dir Central Proc PAC Kamra
- 📞 Contact Phone
- +92-51-9099-2534
- ✉️ Contact Email
- adcppre1@pac.org.pk
Actions
⬅️ Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Construction of Surface Drains, Culverts, Bridges, and Paver Blocks in Town Committee...
Close: 2026-06-29 Setharja, Sindh
Construction of Surface Drains, Culverts, Bridges, and Paver Blocks in Town Committee...
Close: 2026-06-29 Khairpur, Sindh
Construction of Paver Block Streets, CC Block Streets and Small Bridges at...
Close: 2026-06-15 Tando Muhammad Khan, Sindh
Construction of Surface Drains, Culverts, Bridges, Paver Blocks and Brick Pavements in...
Close: 2026-06-29 Setharja, Sindh
Construction of Surface Drains, Culverts, Bridges, and Paver Blocks in Town Committee...
Close: 2026-06-29 Khairpur, Sindh
External Development Work of Construction of Faculty of Social Science Building at...
Close: 2026-06-30 Jamshoro, Sindh
Tender Description
This tender invites bids for the supply, installation, and commissioning of a reverse osmosis plant including water softener and related civil and electrical works for Pakistan Aeronautical Complex Kamra. The scope includes a turnkey solution with warranty and spares support.
The project requires a double stage membrane RO plant with a capacity of 10,000 to 12,000 LPH, including pumps, filters, storage tank, electrical panel, chemical dosing, and civil foundation works. The supplier must provide operational training, warranty for 2 years, 5 years spares inspection, and 10 years spare parts provisioning. Installation, commissioning, and site survey are mandatory. Delivery period is 8 to 12 weeks with strict compliance to specifications and inspection criteria.