WhatsApp Chat

Supply of Tyre Tubeless Radial Size 385/95 R-25 for Sui Southern Gas Company

πŸ“Œ Tender No: SSGC/LP/EPADS/NR/2124064
πŸ›οΈ Issuing Authority:Sui Southern Gas Company Limited
Expired Tender
⏰ Closing Date:
2026-02-17

Tender Document

Tender Description

This tender from Sui Southern Gas Company Limited in Karachi invites bids for the supply of tubeless radial tyres, size 385/95 R-25, designed for heavy-duty use with a maximum load capacity of 6000 kg at 130 PSI and a maximum speed of 80 km/h. The tyres must be of high quality, meeting strict technical specifications including manufacturing year, brand, and country of origin. Delivery is scheduled within 30 to 45 days after purchase order confirmation, with the delivery location at Base Camp Khadeji Stores. The procurement requires bidders to submit a physical bid bond and participate via the EPADS online system. The tyres must be suitable for on/off-road conditions, including mud and snow environments, and must come with supporting technical literature detailing tread, load index, and tyre wall specifications. The supplier is responsible for replacing any defective or recycled tyres at their own cost. Compliance with GST and other tax regulations is mandatory, and all bids will be evaluated on the lowest technically and commercially compliant basis. Bidders should ensure they meet the PEC category requirements and maintain valid FBR/ATL status for the fiscal year 2025-26. The bid bond is fixed at PKR 40,000, and all submissions must adhere to the stipulated terms including warranty coverage and performance guarantees. Non-compliance with technical or documentation requirements will lead to rejection. The submission deadline is set for 17th February 2026 at 11:30 AM, with bid opening at the SSGC Head Office Tender Room in Karachi. Bidders must submit sealed physical bid bonds and upload scanned copies on EPADS before the deadline. All documents must be signed and stamped as per tender instructions. Pro-Tip: Carefully review the special terms regarding bid bond submission and ensure the manufacturing date of tyres is within 12 months of the purchase order date to avoid disqualification. Also, verify the inclusion of all required technical literature to prevent bid rejection.
Scroll to Top

Continue Browsing

Mazeed tenders dekhte rehne ke liye number enter kar ke continue karein.

Verify on WhatsApp