Rehabilitation and Widening of Pcc Road Batangi Phagwaridoga and Sailkot U/C Pattan Kalan and Construction of New Road Boi to Namal via Pattan Khord
📌 Tender No: ADP No.1159/190467
Expired Tender
⏰ Closing Date:
2025-12-19
2025-12-19
Tender Overview
- 📂 Category
- Road & Infrastructure Works
- 🏭 Sector
- Works
- 📄 Tender Type
- Works
- ⚙️ Procurement Method
- Single Stage Two Envelope
- 📨 Submission Method
- E-PAD system via courier half an hour before closing date and time
- 💰 Estimated Cost
- 80.758 million PKR, 117.651 million PKR
- 🌐 Source Name
- Khyber Pakhtunkhwa PPRA
Location & Dates
- 📍 City
- Abbottabad
- 🗺️ Province
- Khyber Pakhtunkhwa
- 🌍 Country
- Pakistan
- 📅 Publish Date
- 2025-12-11
- ⏳ Closing Date
- 2025-12-19
- 🕒 Created At
- 2025-12-11 18:48:29
Contact & Websites
- 👤 Contact Person
- Executive Engineer
Actions
⬅️ Back to All Tenders
Looking for more tenders like this? View all active Road & Infrastructure Works tenders.
Related Tenders
Construction of Surface Drains, Culverts, Bridges, and Paver Blocks in Town Committee...
Close: 2026-06-29 Khairpur, Sindh
Construction of Surface Drains, Culverts, Bridges, and Paver Blocks in Town Committee...
Close: 2026-06-29 Setharja, Sindh
Construction of Surface Drains, Culverts, Bridges, and Paver Blocks in Town Committee...
Close: 2026-06-29 Khairpur, Sindh
Construction of Paver Block Streets, CC Block Streets and Small Bridges at...
Close: 2026-06-15 Tando Muhammad Khan, Sindh
Construction of Surface Drains, Culverts, Bridges, and Paver Blocks in Town Committee...
Close: 2026-06-29 Khairpur, Sindh
Highway Safety Works on Motorway M-4 Multan-Pindi Bhattian
Close: 2026-07-02 Faisalabad, Punjab
Tender Description
This tender invites bids for the rehabilitation and widening of Pcc Road Batangi Phagwaridoga and Sailkot U/C Pattan Kalan, including the construction of a new road from Boi to Namal via Pattan Khord in Abbottabad district. The works are divided into two main packages covering different road sections with specified estimated costs.
The procurement follows the KPPRA procurement rules 2014 with amendments up to 10/05/2022, using a single stage two envelope procedure. Bidders must submit their bids electronically through the E-PAD system and comply with bid security and tender fee requirements. The completion period is as per the work order, with bid submission and technical bid opening scheduled for 19th December 2025.