Providing, Installation & Commissioning of Hybrid Solar System at University of Lakki Marwat
ποΈ Issuing Authority:University of Lakki Marwat
Expired Tender
β° Closing Date:
2025-12-26
2025-12-26
Tender Overview
- π Category
- Electrical & Solar Equipment / Power
- π Sector
- Works
- π Tender Type
- Works
- π¨ Submission Method
- EPAD online portal
- π° Estimated Cost
- Rs. 80.569 Million
- π Source Name
- Khyber Pakhtunkhwa PPRA
Location & Dates
- π City
- Lakki Marwat
- πΊοΈ Province
- Khyber Pakhtunkhwa
- π Country
- Pakistan
- π Publish Date
- 2025-12-11
- β³ Closing Date
- 2025-12-26
- π Created At
- 2025-12-11 17:08:03
Contact & Websites
- π€ Contact Person
- Focal Person Solarization
- π Contact Phone
- 0969-510019
Actions
π₯ Download Tender Document
β¬
οΈ Back to All Tenders
Looking for more tenders like this?
View all active Electrical & Solar Equipment tenders.
Related Tenders
Rehabilitation and Installation of Solar and Electric Street Lights in Mardan
Close: 2026-04-07
Mardan, Khyber Pakhtunkhwa
Providing and Installation of Solar Powered Street Lights at M.T Khan Road...
Close: 2026-04-01
Karachi, Sindh
Supply and Installation of Solar Systems, Generators, Medical Equipment, Furniture and Miscellaneous...
Close: 2026-03-27
Islamabad, Islamabad Capital Territory
Supply and Installation of Solar Power Systems for Rural Electrification in Sindh
Close: 2024-07-01
Karachi, Sindh
Replacement of Outlived Passenger Elevators at Allama Iqbal International Airport Lahore
Close: 2026-03-30
Lahore, Punjab
Supply and Installation of Solar Systems, Air Conditioners, Chemicals, Laboratory Equipment, IT...
Close: 2026-03-31
Faisalabad, Punjab
Tender Document
Tender Description
The University of Lakki Marwat is inviting bids for the provision, installation, and commissioning of a hybrid solar system at its campus. The project requires firms or contractors with valid KPRA registration, ATL of FBR, and registration with the Pakistan Engineering Council under specified solar specialization codes.
The contract duration is four months, and bidders must comply with all mandatory criteria including bid security, technical bid submission, and local office requirements. The tender emphasizes adherence to KPRA rules and submission deadlines.