Supply and Installation of Solar Systems, Air Conditioners, Chemicals, Laboratory Equipment, IT Accessories and Furniture for National Textile University
📌 Tender No: GH-26/03-01
Expired Tender
⏰ Closing Date:
2026-03-31
2026-03-31
Tender Overview
- 📂 Category
- Furniture & Furnishings / HVAC & Refrigeration / IT & Computer Equipment / Pharmaceuticals / Solar & Power Equipment
- 🏭 Sector
- Goods
- 📄 Tender Type
- Goods
- ⚙️ Procurement Method
- National Single Stage-Two Envelope
- 📨 Submission Method
- Online portal
- 💰 Estimated Cost
- PKR 10 Crore approx
- 🌐 Source Name
- PPRA
Location & Dates
- 📍 City
- Faisalabad
- 🗺️ Province
- Punjab
- 🌍 Country
- Pakistan
- 📅 Publish Date
- 2026-03-15
- ⏳ Closing Date
- 2026-03-31
- 🕒 Created At
- 2026-03-15 17:43:41
Contact & Websites
- 👤 Contact Person
- Assistant Professor
- 📞 Contact Phone
- +92-033-367-8284
- ✉️ Contact Email
- ahsan@ntu.edu.pk
- 🌐 Website
- https://vendors.epads.gov.pk/
- 🔗 Original Source
- https://vendors.epads.gov.pk/
Actions
🔗 View Original Advertisement
⬅️ Back to All Tenders
Looking for more tenders like this? View all active Furniture & Furnishings tenders.
Related Tenders
Providing and Fixing Wooden Wall Mounted Cabinets in Examination Cell Management Sciences...
Close: 2026-06-26 Quetta, Balochistan
Supply of Office Furniture and Stationery for Karachi Development Authority
Close: 2024-06-17 Karachi, Sindh
Sale of Used Office Equipment, Vehicles, and Scrap at University of Science...
Close: 2026-06-18 Bannu, Khyber Pakhtunkhwa
Supply of Medical Equipment, Medical Furniture, and Instruments
Close: 2026-06-16 Khyber Pakhtunkhwa
Procurement of Sports Gears, Gym Equipment and Furniture for Hostels
Close: 2026-06-18 Peshawar, Khyber Pakhtunkhwa
Supply of Medical, Dental, IT, Laboratory, and Office Items for Khyber College...
Close: 2026-06-30 Peshawar, Khyber Pakhtunkhwa
Tender Description
This procurement opportunity in Faisalabad by the National Textile University (ORIC) covers a diverse range of categories including solar power systems, HVAC equipment, laboratory chemicals, IT accessories, and office furniture. The scope includes turnkey supply and installation of 50 KW and 20 KW on-grid solar systems at Faisalabad and Karachi campuses respectively, along with various types of air conditioners, laboratory chemicals and consumables, rotary evaporator, digital hot plates, certified reference materials, IT cables, and ergonomic furniture for offices and labs.
The solar systems require high-quality Tier 1 photovoltaic modules with advanced TOPCon technology, efficient inverters with zero export features, and robust mounting structures designed to withstand local environmental conditions. Installation includes all civil and electrical works ensuring no damage to rooftops and full operational readiness. Air conditioners must feature copper piping, tropical compressors, and extended warranties. Laboratory chemicals and consumables must meet strict purity and certification standards with verified certificates of analysis. Furniture includes executive revolving chairs, wooden visitor chairs, lab chairs, and office tables with ergonomic and durable specifications.
Bidders must comply with PEC categories, maintain valid FBR registrations including NTN and GST, and meet the 2025-26 financial year requirements. The tender mandates submission of bid security in specified forms and adherence to the Public Procurement Rules 2004. Technical bids will be evaluated on company eligibility, past performance, compliance with specifications, and warranty support. The procurement follows Least Cost Based Selection (LCBS) ensuring cost-effectiveness without compromising quality.
The submission deadline is set for 31st March 2026 at 02:30 PM with bid opening at 03:00 PM via the EPADS v2.0 online portal. Physical submission of bid security is required at the university address: 203/RB Manawala, Sheikhupura Road. Bidders should ensure registration on EPADS and prepare all documents including performance guarantees and bid securing declarations as per instructions.
Pro-Tip: Carefully review the detailed technical specifications and warranty clauses especially for the solar system components and HVAC units. Ensure all certificates and manufacturer brochures are authentic and verifiable on official websites to avoid disqualification. Also, confirm timely submission of original bid security physically to prevent outright rejection. This tender demands strict compliance with technical and procedural requirements, so meticulous preparation is key to success.
