Tender Overview
- Category
- Construction & Civil Works / Water Supply & Sanitation
- Sector
- Works
- Tender Type
- Works
- Procurement Method
- Single Stage Two Envelope
- Submission Method
- Via EPAD Portal (Technical and Financial Separately)
- Estimated Cost
- Rs. 97.428 Million
- Source Name
- SINDH PPRA
Location & Dates
Contact & Websites
- Contact Person
- Executive Engineer
- Website
- sppra.gov.pk
- Original Source
- https://sppra.gov.pk
Actions
Download Tender Document
View Original Advertisement
Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Construction of Additional Floor at C-Arts Centre Gulistan-e-Johar Karachi
Close: 2026-10-05 Karachi, Sindh
Construction of Director General SPDPA Office at Karachi (ADP No.229 of 2026-27)
Close: 2026-10-05 Karachi, Sindh
Construction of Government Special Education & Rehabilitation Centre at Bin Qasim Town...
Close: 2026-10-05 Karachi, Sindh
Construction of Guard Room at HQPAA Parking Near Canteen, Karachi
Close: 2026-10-30 Karachi, Sindh
Water Proofing of Expansion Joints of Departure Level Bridge Level III at...
Close: 2026-09-24 Islamabad, Islamabad Capital Territory
Provision and Installation of Signage and Fascia Structures at NVROS of Sahiwal...
Close: 2026-09-29 Sahiwal, Punjab
Tender Document
Tender Description
The Education Works Division Korangi Karachi, under the Department of Empowerment of Persons with Disabilities, invites bids for the construction of the Down Syndrome and Neurodiversity Rehabilitation Centre at Karachi (ADP No.243 of 2026-27). This project involves comprehensive civil, woodwork, flooring, false ceiling, compound wall, water supply, and sanitary works. Items being procured:
- Excavation in foundation of building, bridges & other structures
- Pavement of 8" deep stone sets chisel dressed set in lime mortar
- Reinforced cement concrete work in roof slab, beams, columns, rafts, liftels
- Fabrication of deformed steel reinforcement
- Erection and removal of centering for RCC or plain cement concrete works
- Cement concrete plain 1:3:6
- Vertical damp proof course of 3/4" thick cement plaster with bitumen
- Damp proof course with cement sand and shingle concrete
- Providing & laying 2mm thick grip PVC waterproofing membrane
- Filling, watering & ramming earth in under floor
- Cement plaster 1:4 upto 12' height
- Masonry work with cement concrete solid blocks
- Providing and fixing GI frames/chowkhats for doors and windows
- Providing and fixing UPVC channels framing for sliding windows and doors
- Providing & laying full body porcelain tiles flooring
- Providing and fixing wooden doors, windows, false ceiling, stair railing
- Anti-termite treatment
- Painting and distempering works
- Plumbing and sanitary fittings including WC pans, wash basins, CI pipes, valves, manholes, and water tanks
The technical scope covers all materials, workmanship, and site works as per PWD specifications and CSR-2024 standards. The project duration is 24 months with an estimated cost of Rs. 97.428 Million. Bidders must be registered with Pakistan Engineering Council in relevant categories, have valid FBR and SRB registration, and demonstrate experience in similar works. Earnest Money of Rs. 4.85 Million and a tender fee of Rs. 5,000 are required. Bids must be submitted via the EPAD portal in separate technical and financial envelopes by 05 October 2026 at 11:00 AM, with bid opening at 11:30 AM the same day at the office of the Executive Engineer, Education Works District Korangi Karachi.
A practical tip for bidders: Ensure all mandatory eligibility documents including valid PEC registration, FBR/SRB certificates, ISO certifications, and proof of similar work experience are complete and verifiable to avoid disqualification. Also, carefully prepare the technical proposal and construction schedule as per the bidding data requirements to demonstrate capability for timely completion.