Construction of Road Corridor and BRT Infrastructure Yellow BRT Corridor Segments 5, 6 & 7 and Segments 4 & 5
Tender No: PK-SMTA-449988-CW-RFB
Active Tender
Closing Date:
2026-09-15
2026-09-15
Tender Overview
- Category
- Construction & Civil Works / Road & Infrastructure Works
- Sector
- Works
- Tender Type
- Works
- Procurement Method
- Request for Bids (RFB)
- Submission Method
- Physical submission of sealed bids
- Estimated Cost
- PKR 129,000,000 for Lot I and PKR 262,000,000 for Lot II
- Source Name
- Newspaper
Location & Dates
Contact & Websites
- Contact Person
- Engr. Saleem Hussain
- Contact Phone
- +92 21 99336117, +92 331 27 28 313
- Contact Email
- pd.kmp.ylc@gmail.com, pcms.kmp.ylc@gmail.com
- Website
- https://kmp.gos.pk
Actions
Download Tender Document
Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Providing and Fixing Paving Block for Street Improvement in Majeed Colony Malir
Close: 2026-07-20 Karachi, Sindh
Repair and Replacement of Sewerage Line in Majeed Colony Union Committee 04...
Close: 2026-07-20 Karachi, Sindh
Supply and Maintenance of Electrical and Allied Facilities at Institute of Business...
Close: 2023-07-30 Karachi, Sindh
Supply of Abkalani Material, Labour, Machinery, Stationary, Office Material, Computer Software and...
Close: 2026-08-31 Jamshoro, Sindh
Rehabilitation of 1st Floor Executive Washrooms at Office Building LMT
Close: 2026-08-04 Karachi, Sindh
Provision of Certain Facilities at PAF Base
Close: 2026-08-05 Chaklala, Punjab
Tender Document

Tender Description
The Sindh Mass Transit Authority (SMTA), Transport and Mass Transit Department, Government of Sindh, Karachi, is procuring works for the Karachi Urban Mobility Project Yellow Line Bus Rapid Transit System (BRTS). This tender covers the construction of road corridor and BRT infrastructure for Yellow BRT Corridor Segments 5, 6 & 7 from CH. 0+000 at Khalid Bin Waleed Intersection to CH. 3+875 at Kala Pull (Lot I), and Segments 4 & 5 from CH. 3+875 at Kala Pull to CH. 7+571 at KPT Interchange (Lot II).
Items being procured:
- Construction of one underpass
- One underground BRT station
- Three at-grade BRT stations
- One pedestrian crossing bridge (V3)
- One vertical circulation (V5)
- Kala Pull Bridge
- One pump station at Tariq Road Underpass
- BRT and mixed-traffic lanes
- Service roads
- Traffic signals
- Three electrical substations
- Street lighting
- Temporary traffic diversions
- Utility relocations and protection
The project scope includes approximately 3.875 km for Lot I and 3.396 km for Lot II, involving complex civil works such as underpasses, bridges, road pavements, and electrical installations. The construction period is 660 days for Lot I and 780 days for Lot II. Bidders must demonstrate financial capacity with audited statements for the last five years, minimum annual construction turnover of USD 37.60 million for Lot I and USD 65 million for Lot II, and at least seven years of general construction experience. Completion of at least two similar contracts with values exceeding USD 23 million for Lot I and USD 47 million for Lot II is required. Key activities include steel structures, urban road works, underpasses, and rigid pavements.
Bids must be submitted by 15th September 2026 at 1100 hours Pakistan Standard Time to the Project Director at SMTA, House # C-44, Lane 07, Block 2 Clifton, Karachi. Electronic bidding is not permitted. Bid security of PKR 129 million for Lot I and PKR 262 million for Lot II is mandatory. The bidding process follows a single stage two envelope system with technical and financial parts. The evaluation criteria allocate 50% weight to technical and 50% to financial bids.
Interested bidders should ensure compliance with PEC registration, FBR/ATL registration, and provide all required documentation including Earnest Money and CDR. A practical tip for bidders is to carefully review the detailed scope and ensure financial statements clearly demonstrate the required turnover and experience to avoid disqualification during technical evaluation. Early submission of bids and thorough preparation of technical documents will enhance chances of success.