Enhancement of Agriculture Productivity Through Water Management Schemes in Duki PSDP 2026-27
Tender No: TSE-2627081164503
Active Tender
Closing Date:
2026-08-31
2026-08-31
Tender Overview
- Category
- Construction & Civil Works / Solar & Power Equipment / Water Supply & Sanitation
- Sector
- Works
- Tender Type
- Works
- Procurement Method
- Single Stage Two Envelope Bidding Procedure
- Submission Method
- Electronic submission via supplier dashboard
- Estimated Cost
- Rs. 198,046,754
- Source Name
- Newspaper
Location & Dates
- City
- Duki
- Province
- Balochistan
- Country
- Pakistan
- Publish Date
- 2026-08-17
- Closing Date
- 2026-08-31
- Created At
- 2026-08-17 07:50:55
Contact & Websites
- Contact Person
- Deputy Director Agriculture
- Contact Phone
- 03352278893
- Website
- www.bppra.gob.pk
Actions
Download Tender Document
Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Construction of Flyover at Garden Intersection Nishtar Road Karachi
Close: 2026-09-02 Karachi, Sindh
Construction of Futsal Court at IBA Main Campus Karachi
Close: 2026-09-02 Karachi, Sindh
Improvement and Rehabilitation of Road Infrastructure in Saddar Town Municipal Corporation, Karachi...
Close: 2026-08-19 Karachi, Sindh
Rehabilitation of Vertical Storage Tank #303 at Keamari Terminal Karachi
Close: 2026-08-11 Karachi, Sindh
Rehabilitation of Vertical Steel Storage Tank T-09 at PSO ZOT Karachi
Close: 2026-08-06 Karachi, Sindh
Rehabilitation of Vertical Storage Tank # 6809 at Sihala (Dia: 18.288 M,...
Close: 2026-08-13 Sihala, Punjab
Tender Document

Tender Description
The Deputy Director Agriculture On Farm Water Management District Duki invites sealed electronic bids from eligible bidders for the execution of work under the PSDP scheme for the fiscal years 2026-27 based on the Balochistan Composite Schedule of Rates 2026. The tender fee is Rs. 1,000 payable via Green Challan form deposited in the head of account (Agric: Receipt) A/c No. (C03136). Earnest money of 2% of the tender cost must be submitted in the form of Call Deposit. The time limit for completion of work is 30-06-2027.
Items being procured:
- Enhancement of Agriculture Productivity Through Water Management Schemes in Duki PSDP No. 101(Z2026.4108) 2026-27
The scope includes construction and enhancement of water management schemes aimed at improving agricultural productivity in Duki. The project involves civil engineering works related to dams, water retaining structures, water supply, and solar installation for irrigation purposes. The contractor must be an authorized dealer/distributor of reputed Chinese brand solar panels and submersible pumps. The bidder must provide confirmation of 10 years performance warranty for solar panels with 90% efficiency and 25 years performance warranty with 80% efficiency, along with a one-year warranty for all items supplied under the contract.
Eligibility criteria require bidders to be on the Active Taxpayer List and not blacklisted by any procuring agency. Registration with Balochistan Revenue Authority and Pakistan Engineering Council (PEC) C-4 or above in relevant categories CE04(i), CE09(ii), CE10(i), and EE11(vi) is mandatory. Bidders must have completed at least 3 assignments of similar nature with a turnover of at least PKR 138,632,727 in the last three years. Income Tax Registration and submission of Income Tax Returns for fiscal years 2023-24, 2024-25, and 2025-26 are required. Audit reports and bank credit line certificates not older than July 2026 must be submitted.
Tender documents can be obtained and viewed electronically at www.bppra.gob.pk. Bids must be submitted electronically via the supplier dashboard by **31 August 2026 at 10:00 AM**. Tender opening will occur the same day at 11:00 AM on the EPPS system. Submission address is Deputy Director Agriculture On Farm Water Management District Duki.
A practical tip for bidders: Ensure all financial and technical documents are up to date and comply with PEC and tax authority requirements to avoid disqualification during the technical evaluation stage.