0 Trusted Subscribers
0 Tenders Listed
Daily Updates
Obtaining NOC from EPA Punjab for Operational Phase of PSO Faisalabad Depot Along with Allied Structures
Tender No: RFQ No OP19876NZR
Active Tender
Closing Date:
2026-09-23
2026-09-23
Tender Overview
- Category
- Consultancy Services
- Sector
- Consultancy
- Tender Type
- Consultancy
- Source Name
- PPRA
Location & Dates
- City
- Faisalabad
- Province
- Punjab
- Country
- Pakistan
- Publish Date
- 2026-09-08
- Closing Date
- 2026-09-23
- Created At
- 2026-09-08 10:46:56
Contact & Websites
- Contact Phone
- (021) 9203866-85
Actions
Download Tender Document
Back to All Tenders
Looking for more tenders like this? View all active Consultancy Services tenders.
Related Tenders
Services for Construction Management at PSO Locations - Central Region and North...
Close: 2026-09-22 Karachi, Sindh
Procurement of Consultancy Services for Expressions of Interest for Ecosystem Development
Close: 2026-09-24 Islamabad, Islamabad Capital Territory
Consultancy to Review PC-I, Detailed Engineering Design, Preparation of Estimates, BOQ, Revised...
Close: 2026-09-08 Hyderabad, Sindh
Corrigendum for Eligibility Criteria Rectification for Mashkel Dam Project
Close: 2026-09-14 Balochistan
Development of Robotics and Intelligent Systems Lab at The University of Haripur
Close: 2026-09-24 Haripur, Khyber Pakhtunkhwa
Pre-Qualification for Establishment of PMD National Operations Centre
Close: 2026-09-28 Islamabad, Islamabad Capital Territory
Tender Document
Tender Description
Pakistan State Oil Company Limited (PSO) invites quotations for consultancy services to obtain the No Objection Certificate (NOC) from the Environmental Protection Agency (EPA) Punjab for the operational phase of PSO Faisalabad Depot along with allied structures. This procurement is specifically for environmental compliance consultancy to ensure all statutory requirements are met for pipeline operation, main storage tank operation, and storage & handling of petroleum oils and lubricants (POLs) at the Faisalabad Depot.
Items being procured:
- Preparation of Compliance Status Report (CSR) and Environmental Management Plan (EMP) for pipeline operation
- Preparation of Environmental Monitoring Reports (Ambient Air, Ground Water, Noise, Waste Water/Validation)
- Preparation and vetting of CSR from Assistant Director Environment Lahore
- Inspection and testing of NEQS as per EPA recommendations
- Preparation of all other documents required by EPA
- Submission and provision of final approved NOC in the name of PSO for operational phase
The scope covers the operational phase NOC for the pipeline, main storage tanks, and storage & handling of POLs. The consultant will prepare all necessary reports, conduct inspections, and coordinate with EPA authorities including site visits if required. The job includes preparation of layouts, sketches, diagrams, and all documentary drawings needed by EPA without extra charges. The vendor will also handle all government fees and demand notices related to the process.
The work must be completed within 60 days from issuance of the service order. Payment will be made against vendor invoices after successful completion and approval by PSO designated officials. All government taxes are included in the quoted rates. Liquidated damages of 0.1% per day up to 10% of the order value apply for delays. The vendor must ensure full compliance with all applicable laws and regulations throughout the assignment.
This tender is issued by Pakistan State Oil Company Limited based in Karachi but the work location is Faisalabad. Interested bidders should have relevant experience in environmental consultancy and be registered with FBR and ATL. Earnest money and bid security requirements apply as per PSO rules.
Bids must be submitted by **23rd September 2026**. Submission details and contact information are provided below. Bidders are advised to carefully review the scope and ensure all documents and requirements are met to avoid disqualification. Early preparation of technical and financial bids with complete documentation is recommended to facilitate smooth evaluation.
This is a valuable opportunity for qualified environmental consultancy firms to support PSO Faisalabad Depot in achieving regulatory compliance and operational readiness under EPA Punjab guidelines. Timely and professional delivery will be critical for contract success.
