Amendment No. 1 for Supply of Spun/PCC Poles for Rehabilitation of 11kV Feeders
Tender No: PK-MEPCO-555004-GO-RFB
Expired Tender
Closing Date:
2026-07-17
2026-07-17
Tender Overview
- Category
- Electrical Works & Equipment
- Sector
- Goods
- Tender Type
- Goods
- Procurement Method
- Request for Bids
- Source Name
- Newspaper
Location & Dates
Contact & Websites
- Contact Person
- Chief Engineer (Development), PMU MEPCO Multan
Actions
Download Tender Document
Back to All Tenders
Looking for more tenders like this? View all active Electrical Works & Equipment tenders.
Related Tenders
Upgradation and Rehabilitation of Electric Lighting System at Pak China Friendship Centre
Close: 2026-08-31 Islamabad, Islamabad Capital Territory
Supply of Electronic Modules, Panel and Distribution Boards, and Controller XE Pro
Close: 2026-08-25 Karachi, Sindh
Provision and Installation of Fire Hydrant Systems at Hyderabad and Sukkur Warehouses
Close: 2026-08-25 Hyderabad, Sindh
Supply of Engineering Equipment Spares for Generators, Pionjar Drills and Engines
Close: 2026-08-19 Lahore, Punjab
Procurement of Solar Plants and Solar Street Lights for District Ghotki
Close: 2026-09-16 Mirpur Mathelo, Sindh
Construction of Lawyers Shed, Lift and Cabin Shops at Judicial Complex Hangu
Close: 2026-08-27 Hangu, Khyber Pakhtunkhwa
Tender Document

Tender Description
This corrigendum amends the bidding document issued by **Multan Electric Power Company Limited (MEPCO)** under Tender No. PK-MEPCO-555004-GO-RFB for the supply of spun and PCC poles for rehabilitation of 11kV feeders on a lot-wise basis. It refers to the original tender notice published on 10 July 2026 under PID (L) 67/26. The amendment should be read with the original bidding documents, and all other terms remain unchanged.
Mandatory lot listing: Lot 1, Lot 2, Lot 3, Lot 4, and Lot 5. The corrigendum does not reproduce quantities, units, technical specifications, or individual lot descriptions; bidders must consult the complete schedule of requirements and price schedule for those details. The procurement covers HT/LT spun poles and PCC poles intended for the stated 11kV feeder rehabilitation project.
Section II, Bid Data Sheet, ITB Clause 14.8(a)(iii), is revised to provide delivery on EX Works basis. Until the purchased poles are collected from the supplier premises, the supplier remains responsible for security, custody, surveillance, and protection against loss, damage, or deterioration. The final destination or project site is therefore to be treated on an EX Works basis.
In Section IV, Bidding Forms and Price Schedule, column 7 for Lots 1 through 5 is revised and shall be read as Not Applicable. Section VII, Schedule of Requirement, is amended accordingly. Section IX, GCC Clause 18.1, now requires performance security equal to **05% of the total contract price**.
Under GCC Clause 16.1, sub-clause ii, **80%** of the total EX Works contract price, or the pro-rata amount for goods delivered and accepted, will be paid on delivery after submission of documents specified in GCC Clause 13. The notice provides no new bid security, eligibility, or ATL requirements; bidders should verify these in the original document.