Amendment No. 1 for Supply of Spun/PCC Poles for Rehabilitation of 11kV Feeders
Tender No: PK-MEPCO-555004-GO-RFB
Expired Tender
Closing Date:
2026-07-17
2026-07-17
Tender Overview
- Category
- Electrical Works & Equipment
- Sector
- Goods
- Tender Type
- Goods
- Procurement Method
- Request for Bids
- Source Name
- Newspaper
Location & Dates
Contact & Websites
- Contact Person
- Chief Engineer (Development), PMU MEPCO Multan
Actions
Back to All Tenders
Looking for more tenders like this? View all active Electrical Works & Equipment tenders.
Related Tenders
Procurement of T-2082 Drill Machine, Hand Grinder, First Aid Box, Hammer &...
Close: 2026-10-14 Quetta, Balochistan
Procurement of T-2081 Hydraulic Press (Y-35), Tool Bag, Tree Trimmer, Cuffing Hoist...
Close: 2026-10-14 Quetta, Balochistan
Procurement of T-2078 Rubber Insulated Gloves by Quetta Electric Supply Company (QESCO)
Close: 2026-10-14 Quetta, Balochistan
Supply of Material for 132 KV Capacitor Bay at 132 KV G/S...
Close: 2026-09-30 Faisalabad, Punjab
Supply of Digital Read Out Display Units and Liner Scales
Close: 2026-12-08
Renovation of Kitchen and Electric Works for 05-No. Hostels, Admin Block &...
Close: 2026-10-10 Lahore, Punjab
Tender Description
This corrigendum amends the bidding document issued by **Multan Electric Power Company Limited (MEPCO)** under Tender No. PK-MEPCO-555004-GO-RFB for the supply of spun and PCC poles for rehabilitation of 11kV feeders on a lot-wise basis. It refers to the original tender notice published on 10 July 2026 under PID (L) 67/26. The amendment should be read with the original bidding documents, and all other terms remain unchanged.
Mandatory lot listing: Lot 1, Lot 2, Lot 3, Lot 4, and Lot 5. The corrigendum does not reproduce quantities, units, technical specifications, or individual lot descriptions; bidders must consult the complete schedule of requirements and price schedule for those details. The procurement covers HT/LT spun poles and PCC poles intended for the stated 11kV feeder rehabilitation project.
Section II, Bid Data Sheet, ITB Clause 14.8(a)(iii), is revised to provide delivery on EX Works basis. Until the purchased poles are collected from the supplier premises, the supplier remains responsible for security, custody, surveillance, and protection against loss, damage, or deterioration. The final destination or project site is therefore to be treated on an EX Works basis.
In Section IV, Bidding Forms and Price Schedule, column 7 for Lots 1 through 5 is revised and shall be read as Not Applicable. Section VII, Schedule of Requirement, is amended accordingly. Section IX, GCC Clause 18.1, now requires performance security equal to **05% of the total contract price**.
Under GCC Clause 16.1, sub-clause ii, **80%** of the total EX Works contract price, or the pro-rata amount for goods delivered and accepted, will be paid on delivery after submission of documents specified in GCC Clause 13. The notice provides no new bid security, eligibility, or ATL requirements; bidders should verify these in the original document.
The notice does not print a separate submission address or method. Confirm the deadline and delivery instructions with the PMU MEPCO Multan before filing, and submit the amended pages with the bid to avoid inconsistency.