Design, Supply, Installation, Testing and Commissioning of ±70 MVAr STATCOM at 132kV Grid Station Pasni for Grid Stability Enhancement
Active Tender
⏰ Closing Date:
2026-12-31
2026-12-31
Tender Overview
- 📂 Category
- Construction & Civil Works / Solar & Power Equipment
- 🏭 Sector
- Works
- 📄 Tender Type
- Works
- ⚙️ Procurement Method
- Single-Stage Two-Envelope (SSTE) Bidding Procedure
- 📨 Submission Method
- Online portal
- 💰 Estimated Cost
- PKR 55000000
- 🌐 Source Name
- PPRA
Location & Dates
- 📍 City
- Pasni
- 🗺️ Province
- Balochistan
- 🌍 Country
- Pakistan
- 📅 Publish Date
- 2026-04-09
- ⏳ Closing Date
- 2026-12-31
- 🕒 Created At
- 2026-04-09 06:20:18
Contact & Websites
- 👤 Contact Person
- Project Director (GSC) QESCO
- 📞 Contact Phone
- 081-2881092
Actions
📥 Download Tender Document
⬅️ Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Sanitation Scheme and Solarization of Tube Well at UC Swabi Khas
Close: 2026-05-11 Swabi, Khyber Pakhtunkhwa
Dredging and Desilting of Urban Critical Waterways in Khyber Pakhtunkhwa
Close: 2026-05-11 Peshawar, Khyber Pakhtunkhwa
Improvement and Rehabilitation of Road, Sewerage Work and Paver Block Fixing at...
Close: 2026-04-28 Karachi, Sindh
Improvement and Rehabilitation of Road, Sewerage Work and Paver Block Fixing at...
Close: 2026-04-28 Karachi, Sindh
Improvement and Rehabilitation of Road, Sewerage Work and Paver Block Fixing Near...
Close: 2026-04-28 Karachi, Sindh
Repair Maintenance of Road From Qureshi Chowk to Madina Masjid UC-09 Jinnah...
Close: 2026-04-28 Karachi, Sindh
Tender Document
Tender Description
This tender invites qualified contractors to execute the design, manufacture, supply, installation, testing, and commissioning of a ±70 MVAr STATCOM system at the 132kV Grid Station Pasni, Balochistan. Issued by the Quetta Electric Supply Company (QESCO), the project focuses on enhancing grid stability in the Mekran region through a turnkey EPC contract. The scope includes modular multi-level converter (MMC) STATCOM technology, associated civil works for flood-resilient control house buildings, and allied infrastructure such as transformers, cooling systems, and telecommunication links.
The contractor must deliver a fully integrated solution including containerized or permanent civil structures, control and protection panels, battery and diesel generator rooms, and comprehensive operation and maintenance (O&M) services for a minimum two-year period post-commissioning. The project demands adherence to international standards such as IEC and IEEE, with detailed system studies, harmonic and dynamic performance verification, and provision of simulation models (PSSE, PSCAD, Power Factory) for independent validation. The contractor is responsible for intensive capacity building, including overseas factory training and on-site shadow-operator programs to ensure QESCO staff technical self-sufficiency.
Compliance with Pakistan Engineering Council (PEC) Category C-A or C-B with specialization EE-05 is mandatory, alongside registration on the EPAD portal and submission of bid security amounting to PKR 55 million. The contractor must maintain a minimum annual forced outage availability of 99.7% and scheduled outage availability of 99.0%, with liquidated damages applicable for non-compliance. The contract includes a performance-linked defects liability period with provisions for warranty extension based on availability benchmarks and recurring faults.
Bids must be submitted electronically via the EPAD portal by the closing date, with original bid security instruments delivered physically to the Project Director QESCO office in Quetta. Technical bids will be evaluated on a weighted combined score (80% technical, 20% financial), with a minimum technical score of 70% required for financial bid opening. The submission deadline and bid opening times are strictly enforced, with no late bids accepted. The physical address for bid security submission is Project Directorate, WAPDA Colony, Sheikh Manda, Airport Road, Quetta.
Pro-Tip: Ensure meticulous compliance with EPAD submission requirements, especially uploading a high-resolution scanned copy of the bid security and all mandatory schedules. Missing or incorrectly uploaded documents can lead to disqualification. Also, carefully review the detailed technical specifications and simulation model requirements to avoid material deviations that could render the bid non-responsive.