Civil Works, Erection, Stringing and Testing & Commissioning for Raising of 220kV D/C Twin Bundle T/Line NKLP-SNR-Ghazi due To Construction of Lahore-Sahiwal-Bahawalnagar Motorway (LSBM) Between Location No. 28 & 30
📌 Tender No: XEN-(S&I)-EHV-01-2026
Expired Tender
⏰ Closing Date:
2026-05-18
2026-05-18
Tender Overview
- 📂 Category
- Construction & Civil Works / Electrical Works & Equipment / Medical Equipment
- 🏭 Sector
- Works
- 📄 Tender Type
- Works
- ⚙️ Procurement Method
- National Competitive Bidding (NCB)
- 📨 Submission Method
- Electronic Submission through EPADS v2.0
- 💰 Estimated Cost
- Rs. 36,672,796.00
- 🌐 Source Name
- PPRA
Location & Dates
Contact & Websites
- 👤 Contact Person
- Executive Engineer S&I Division (EHV-I)
- 📞 Contact Phone
- +92-335-740-1924
- ✉️ Contact Email
- faisal.majeed@ntdc.com.pk
- 🌐 Website
- https://vendors.epads.gov.pk/
- 🔗 Original Source
- https://vendors.epads.gov.pk/
Actions
📥 Download Tender Document
🔗 View Original Advertisement
⬅️ Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Construction of Surface Drains, Culverts, Bridges, and Paver Blocks in Town Committee...
Close: 2026-06-29 Khairpur, Sindh
Construction of Women-Centric Facility (Waiting Room) at Judicial Complex Shahdadkot
Close: 2026-06-30 Kamber, Sindh
Rehabilitation of Common and Washroom Areas with Lift Installation at SLB Multan
Close: 2026-06-30 Multan, Punjab
Shifting and Raising of 220KV Double Circuit Transmission Line Dera Ismail-Zhob Tower...
Close: 2026-06-30 Dera Ismail Khan, Khyber Pakhtunkhwa
Solarized Car Parking Shed for 20 Cars at NILOP Islamabad
Close: 2026-06-14 Islamabad, Islamabad Capital Territory
Repair of Snowfall Damages on 11 KV Feeders in District Kurram
Close: 2026-06-29 Peshawar, Khyber Pakhtunkhwa
Tender Document
Tender Description
The National Grid Company of Pakistan (NGC) Executive Engineer S&I Division (EHV-I) Lahore invites bids for Civil Works, Erection, Stringing and Testing & Commissioning for Raising of 220kV Double Circuit Twin Bundle Transmission Line NKLP-SNR-Ghazi due to the construction of Lahore-Sahiwal-Bahawalnagar Motorway (LSBM) between Location No. 28 & 30. This project is located in Lahore, Punjab and involves comprehensive technical scope including detailed survey, sub-soil investigations, construction of reinforced concrete foundations, erection of steel towers, stringing of ACSR Rail conductors and OPGW, installation of insulators, hardware, and testing and commissioning of the transmission line. The scope also covers dismantling of existing towers, handling and installation of conductors and shield wires, and provision of all necessary equipment, labour, and materials. The project requires PEC license in category C-4 or above, FBR Active Taxpayers List registration, and proven experience in similar 220kV or higher voltage transmission line projects with controlled tension stringing. Bidders must submit technical and financial bids separately through EPADS v2.0 and provide original bid security before the closing date. The estimated cost of the project is PKR 36,672,796 and the contract duration is 120 days. The submission deadline is May 18, 2026, 14:00 PKT. Bidders are advised to carefully review the bidding documents, attend the pre-bid meeting on May 11, 2026, and ensure compliance with all requirements including bid security, performance security, and integrity pact. One practical tip for bidders is to ensure timely registration on EPADS v2.0 and to prepare a detailed construction schedule and method statement as per the technical provisions to demonstrate capability and compliance. The contact person for this tender is Executive Engineer S&I Division (EHV-I), NGC Lahore reachable at +92-335-740-1924 or faisal.majeed@ntdc.com.pk. The tender documents are available on EPADS portal and the official PPRA website. This tender is governed by the Public Procurement Rules, 2004 and includes provisions for grievance redressal and blacklisting in case of non-compliance or fraudulent practices. The project is critical for the power infrastructure and requires strict adherence to quality, safety, and environmental standards.
