WhatsApp Chat
🎁 New Users: 1 MONTH FREE TRIAL — Koi Payment Nahi, Full Access! 📱 WhatsApp Karein

Installation of Solar System at GBLSS Shaikh Tear

Active Tender
⏰ Closing Date:
2026-06-01

Tender Document

Tender Description

The Executive Engineer Buildings Division Water and Services Matiari is procuring the installation of a solar system at GBLSS Shaikh Tear in Matiari, Sindh. This tender invites qualified contractors to undertake the complete scope of work involving supply, installation, and commissioning of solar power equipment at the specified site. The project is situated in Matiari, a city in Sindh province, and aims to enhance energy sustainability for the institution. The technical scope includes the provision and installation of solar panels, associated electrical wiring, mounting structures, and integration with existing power systems. Contractors are expected to comply with all technical specifications and drawings provided by the procuring agency. The work requires careful handling of solar equipment and adherence to safety and quality standards to ensure efficient and durable installation. Eligible bidders must be registered with the Pakistan Engineering Council (PEC) in the appropriate category, possess valid FBR registration, and demonstrate relevant experience in solar system installations. Financial capacity and technical capability as per the tender requirements are mandatory. Bidders should prepare their technical and financial bids in accordance with the bidding documents and submit all required documents including earnest money in the form of a CDR or bank guarantee. The submission deadline is 10:30 AM on 1st June 2026, with bid opening scheduled at 11:00 AM on 16th June 2026 at the office of the Executive Engineer Buildings Division Water and Services Matiari, located at the Deputy Commissioner Office Matiari. Bidders are advised to submit their bids in person or via registered mail to the specified address before the deadline. A practical tip for bidders is to ensure that all bid documents are complete and properly signed, with the original and required copies clearly marked. Early preparation and thorough review of the technical bid can prevent disqualification due to non-compliance. Also, bidders should confirm the validity of their bid security and ensure it meets the stipulated 5% of the bid amount to avoid rejection.
🔒

Full Tender Details for Subscribers

Subscribe to unlock complete information for every tender on Daily Tender Alert.

  • Issuing Authority & Tender No.
  • Estimated Cost & Budget
  • Procurement & Submission Method
  • Official Contact & Website
  • Download Tender Document (PDF)
  • Full Tender Description & Pro-Tips
  • Category-wise Email & WhatsApp Alerts
  • Province-wise & City-wise Alerts
  • Daily WhatsApp Group Access
View Plans & Subscribe
Scroll to Top