Supply of Pressure Relief Valves 1/2 and 3/4 Inch at PSO LPG Plants
Tender No: RFQ No GF-19779YP
Active Tender
Closing Date:
2026-08-06
2026-08-06
Tender Overview
- Category
- Electrical Works & Equipment
- Sector
- Goods
- Tender Type
- Goods
- Procurement Method
- Request for Quotation
- Submission Method
- Quotation Submission
- Source Name
- PPRA
Location & Dates
Contact & Websites
- Contact Phone
- (021) 9203866-85
Actions
Download Tender Document
Back to All Tenders
Looking for more tenders like this? View all active Electrical Works & Equipment tenders.
Related Tenders
Supply and Maintenance of Electrical and Allied Facilities at Institute of Business...
Close: 2023-07-30 Karachi, Sindh
Electrical Work at Women Sport Complex Karachi
Close: 2026-08-10 Karachi, Sindh
Supply of Abkalani Material, Labour, Machinery, Stationary, Office Material, Computer Software and...
Close: 2026-08-31 Jamshoro, Sindh
Procurement of Submersible Pump Motor, Centrifugal Pump, and Distribution Box at NED...
Close: 2026-01-07 Karachi, Sindh
Improvement and Rehabilitation of HVAC Infrastructure at SQMS Directorate, Jinnah International Airport...
Close: 2024-06-08 Karachi, Sindh
LT Type CT Operated AMI Smart Energy Meters
Close: 2026-08-04 Lahore, Punjab
Tender Document
Tender Description
Pakistan State Oil Company Limited (PSO) is procuring Pressure Relief Valves for its LPG plants located in multiple cities including Lahore, Korangi, Akora Khattak, and Dhurnal. This procurement is critical for maintaining safety and operational efficiency at these plants. The department responsible is Pakistan State Oil Company Limited based in Karachi, Sindh.
Items being procured:
- Pressure Relief Valve 1/2" (Make: REGO or Equivalent) Qty: 20 units at Lahore LPG Plant
- Pressure Relief Valve 3/4" (Make: REGO or Equivalent) Qty: 15 units at Lahore LPG Plant
- Pressure Relief Valve 1/2" Qty: 30 units at Korangi LPG Plant
- Pressure Relief Valve 3/4" Qty: 30 units at Korangi LPG Plant
- Pressure Relief Valve 1/2" Qty: 6 units at Akora Khattak LPG Plant
- Pressure Relief Valve 3/4" Qty: 6 units at Akora Khattak LPG Plant
- Pressure Relief Valve 1/2" Qty: 7 units at Dhurnal LPG Plant
- Pressure Relief Valve 3/4" Qty: 7 units at Dhurnal LPG Plant
The valves have specific technical specifications including a start to discharge setting of 250 PSIG, brass valve body material, corrosion resistant steel springs, resilient synthetic rubber seat discs, and a warranty of 10 years. All valves are UL listed and must come with factory inspection and test certificates. Delivery is to be completed in not more than two shipments by 31.12.2026. The contractor is responsible for delivery to the mentioned plants and must comply with HSE requirements at all times.
Eligibility criteria include valid FBR/ATL registration and relevant experience in supplying industrial valves. Earnest Money and CDR requirements apply as per PSO procurement rules. Payment will be made after complete satisfaction of the respective Plant Incharge or Plant Engineer based on actual quantity delivered.
The submission deadline is 06.08.2026 by end of day. Quotations must be submitted as per instructions attached with the RFQ. A practical tip for bidders is to ensure all import and factory documentation is complete and submitted along with the bid to avoid disqualification. Also, note the penalty clause for delayed delivery which is 0.1% per day of undelivered quantity value, capped at 10% of the total order value.
This tender offers a significant opportunity for suppliers specializing in industrial safety valves to engage with a leading national oil company and contribute to critical infrastructure safety.
