Procurement of Single Phase AMI Smart Energy Meters for Sukkur Electric Power Company (SEPCO)
Tender No: 1394/26
Active Tender
Closing Date:
2026-09-10
2026-09-10
Tender Overview
- Category
- IT & Computer Equipment
- Sector
- Goods
- Tender Type
- Goods
- Procurement Method
- Single Stage One Envelope
- Submission Method
- Online submission through EPADS v2.0; original bid security to be submitted physically at Manager Material Management Office, Old Thermal Power Station, SEPCO HQ, Sukkur before deadline
- Source Name
- PPRA
Location & Dates
Contact & Websites
- Contact Person
- Manager Material Management
- Contact Phone
- +92-306-377-5784
- Contact Email
- arif.bhutto@sepco.com.pk
- Website
- https://epads.gov.pk/opportunities/federal/procurements/93613
- Original Source
- https://epads.gov.pk/opportunities/federal/procurements/93613
Actions
Download Tender Document
View Original Advertisement
Back to All Tenders
Looking for more tenders like this? View all active IT & Computer Equipment tenders.
Related Tenders
Procurement of Network Routers
Close: 2026-09-09 Islamabad, Islamabad Capital Territory
Procurement of MS Exchange Server Subscription Edition (SE) Licenses & User CALs...
Close: 2026-09-09 Islamabad, Islamabad Capital Territory
Procurement of one (01) iPhone 16 Pro Non-PTA and one (01) Apple...
Close: 2026-09-09 Karachi, Sindh
Procurement of Software on Frame Work Contract Basis for Punjab Police
Close: 2026-08-31 Lahore, Punjab
Procurement of Firewall Devices, Network Switch, Computer Systems and Laptop for PNSC...
Close: 2026-09-10 Karachi, Sindh
Supply of Domestic Gas Meters G-1.6 and G-4
Close: 2026-07-01 Lahore, Punjab
Tender Document
Tender Description
The Sukkur Electric Power Company (SEPCO) (MM Directorate) invites sealed bids through EPADS v2.0 for the procurement of 30,000 units of Single Phase 2-Wire, 240V, 10/40 Amp, 50Hz AMI Smart Energy Meters with Accuracy Class 1.0 (kWh). These meters include built-in programmable features, remote disconnect/reconnect relay, and PTA compliant 4G communication modules with backward compatibility to 2G, along with MDC driver/software. The meters must comply with NTDC specifications DDS-65:2003, DDS-98:2011, DDS-110:2012, and IEC-62055-31 for relay, with a backup battery capacity of minimum 1200 mAh supported by a super capacitor. The procurement is on a Free Consignee Stores (FCS) basis for delivery at Regional Stores Rohri and Larkana, Sindh. Delivery schedule requires 50% quantity within 90 days and remaining 50% from 91st to 120th day or earlier from the date of purchase order issuance.
Items being procured:
- Static Single Phase 2-Wire AMI Smart Energy Meter, 240V, 10/40A, 50Hz, Accuracy Class 1.0 (kWh)
- Built-in programmable features
- Remote disconnect/reconnect relay
- PTA compliant 4G communication module (backward compatible to 2G)
- MDC driver/software
The meters must be compatible with existing UDIL compliant MDC server installed at WAPDA House Lahore under PITC. Prototype approval from Chief Engineer (Design & Standards) PPMC is mandatory before mass production. The successful bidder must submit PITC UDIL compliance Tier-1 certificate within 20 days of LOI issuance and obtain the certificate within 30 days. Performance guarantee of 5% of contract price including GST is required within 7 days after issuance of UDIL certificate. The warranty period is 24 months from the date of GRN issuance. The supplier is responsible for repair or replacement of defective goods within 45 days of notification at their own cost including lifting and returning.
Bidders must be registered with PEC, FBR, and on the Active Taxpayer List. Experience of at least two contracts of similar nature in last five years is required. Bids must be submitted online on EPADS v2.0 with original bid security submitted physically before deadline. Technical and financial bids will be evaluated on least cost basis. Payment terms include 95% payment upon delivery and GRN issuance and 5% after Tier-2 UDIL certificate issuance. The bid validity period is 90 days. Liquidated damages of 2% per month up to 10% of contract price apply for delayed delivery.
One practical tip for bidders: Ensure timely submission of prototype samples and UDIL compliance documents to avoid disqualification. Register and familiarize yourself with EPADS v2.0 for smooth electronic bid submission and follow all technical specifications strictly to avoid rejection. Contact the Manager Material Management SEPCO Sukkur for clarifications or attend the pre-bid meeting physically or via Zoom on September 1, 2026 at 11:30 AM.
This procurement is a significant opportunity for suppliers of smart energy meters to engage with SEPCO for FY 2026-27 in Sindh province, Pakistan.