0 Trusted Subscribers
0 Tenders Listed
Daily Updates
Strengthening Berm Formation and Works at RD 0-300 Killianwala Disty, Improving Tail of Moza Hafiz Wala Minor, and Associated Flood Protection Works in Faisalabad and Toba Tek Singh
Active Tender
Closing Date:
2026-11-02
2026-11-02
Tender Overview
- Category
- Construction & Civil Works / Water Supply & Sanitation
- Sector
- Works
- Tender Type
- Works
- Procurement Method
- Single Stage Single Envelope
- Submission Method
- Online submission via Punjab-e-Procurement System; attendance at Executive Engineer office for bid opening
- Estimated Cost
- Rs. 5,304,487
- Source Name
- Newspaper
Location & Dates
- City
- Faisalabad
- Province
- Punjab
- Country
- Pakistan
- Publish Date
- 2026-10-20
- Closing Date
- 2026-11-02
- Created At
- 2026-10-20 06:05:03
Contact & Websites
- Contact Person
- Executive Engineer
- Website
- www.punjab.procure.gov.pk
- Original Source
- www.punjab.procure.gov.pk
Actions
Download Tender Document
View Original Advertisement
Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Providing and Fixing Street Lights Different Areas City Toba Tek Singh
Close: 2026-11-17 Toba Tek Singh, Punjab
Tender Notice Single Stage Single Envelope Correction for LG&CD Civil Sub Division...
Close: 2026-11-04 Chakwal, Punjab
Addition/Alteration Work Of Conference Room Of Tevta Secretariat
Close: 2026-11-17 Lahore, Punjab
Construction of PCC Pavement and Drain at Village Chah Noor, District Nankana...
Close: 2026-11-14 Nankana Sahib, Punjab
Construction of Integrated Record Preservation and Public Access Management System at Divisional...
Close: 2026-11-16 Multan, Punjab
Annual Contract for Patch Work, Repair, Rehabilitation, and Decoration by District Council...
Close: 2026-11-16 Faisalabad, Punjab
Tender Document

Tender Description
Punjab Irrigation Department, Burala Division LCC East, Faisalabad, invites tenders from engineering firms and contractors licensed by the Pakistan Engineering Council for a series of strengthening, improvement, and desilting works in District Faisalabad and Toba Tek Singh. The procurement is being conducted under the Single Stage Single Envelope procedure as per the PPRA Punjab E-Procurement System, with item rates based on the 2nd Bi-Annual Market Rate system (01.07.2026 to 31.12.2026).
Items being procured:
- Strengthening Berm Formation and Works at RD 0-300 Killianwala Disty (L&R) (Estimated Cost: Rs. 5,304,487; Earnest Money: 265,224)
- Improving Tail of Moza Hafiz Wala Minor RD 0-100 (Estimated Cost: Rs. 2,804,500; Earnest Money: 140,225)
- Strengthening Berm Formation and Works at RD 0-300 Chuchak Disty (Estimated Cost: Rs. 1,148,430; Earnest Money: 57,422)
- Desilting Punchu Branch RD 0-100 (Estimated Cost: Rs. 357,167; Earnest Money: 17,858)
- Strengthening Weak Section RD 140-280 Killianwala Disty (Estimated Cost: Rs. 454,597; Earnest Money: 22,730)
- Maintaining Country Side Slope and Top Level of Muhammad Shahwala Flood Bund RD 29+100 to 29+500 (Estimated Cost: Rs. 514,056; Earnest Money: 25,703)
- Improving Tail Killianwala Disty (Estimated Cost: Rs. 516,019; Earnest Money: 25,801)
- Desilting / Improving Tail of Dhen Chach Right from RD 0+00 to 30+000 Tail (Estimated Cost: Rs. 197,548; Earnest Money: 9,877)
All works are to be executed as per approved construction drawings and PWD specifications. Only PEC-licensed contractors/firms registered with Punjab E-Procurement System and PPRA are eligible to participate. Earnest Money in the form of deposit at call is required as per each work's estimate. Bids must be submitted online via Punjab-e-Procurement System by 02.11.2026 up to 02:00 PM. Manual submissions or CDR/Bank Guarantees will not be accepted. After uploading, bidders must attend the office of the Executive Engineer, Burala Division LCC East, Faisalabad, on 02.11.2026 at 02:30 PM for bid opening.
A practical tip: Ensure your PEC license and Punjab-e-Procurement registration are valid for the current financial year, and upload all required documents well before the deadline to avoid last-minute technical issues.
