0 Trusted Subscribers
0 Tenders Listed
Daily Updates
Supply and Laying of Metal and Black Topping for Various Link Roads in Bagh Azad Jammu & Kashmir
Tender No: AJK-PD-720-10-26
Active Tender
Closing Date:
2026-10-26
2026-10-26
Tender Overview
- Category
- Construction & Civil Works
- Sector
- Works
- Tender Type
- Works
- Procurement Method
- Single Stage-Single Envelope E-Bidding
- Submission Method
- Electronic submission via Contractor's E-Bidding Dashboard
- Estimated Cost
- Rs. 962.84 Million
- Source Name
- Newspaper
Location & Dates
- City
- Bagh
- Province
- Azad Jammu & Kashmir (AJK)
- Country
- Pakistan
- Publish Date
- 2026-10-14
- Closing Date
- 2026-10-26
- Created At
- 2026-10-14 12:21:43
Contact & Websites
- Contact Person
- Engr. Zeeshan Hamid Butt
- Website
- https://ajkppra.gov.pk/
Actions
Download Tender Document
Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Original Repair and Maintenance Works at University of the Punjab QAC
Close: 2026-11-04 Lahore, Punjab
Removal of Arsenic Media, HVAC Repair, Residential and External Facilities Repairs, External...
Close: 2026-11-09 Multan, Punjab
Improvement and Upgradation Works Including Solar System, Water Supply, Electrical Lines, and...
Close: 2026-11-03 Rawalpindi, Punjab
Special Repair and Renovation Works at Rawalpindi Railway Station and Associated Facilities
Close: 2026-11-12 Rawalpindi, Punjab
Construction and Upgradation Works Including Watch Towers, Sewerage, Roads, and Miscellaneous at...
Close: 2026-11-03 Hyderabad, Sindh
Miscellaneous Improvement Works for Development of Public Address Rooms at Different Locations...
Close: 2026-11-10 Karachi, Sindh
Tender Document

Tender Description
The Office of the Executive Engineer PWD Highways Division Bagh Azad Jammu & Kashmir invites e-bidding under the Single Stage-Single Envelope E-Bidding System for the supply and laying of metal and black topping on various link roads in Bagh city. This procurement is conducted under the Pakistan Engineering Council and C&W Department guidelines for FY 2026-27.
Items being procured:
- Metal and Black Topping of Link Road Upper Kayat Length 10km
- Metal and Black Topping of Link Road Bhanda Orangzeb Mohallah Khari Maldialan Length 0.5 km
- Metal and Black Topping of Link Road Dulli Mohallah/House of Chairman Gulzar 0.5 km
- Metal and Black Topping of Link Road Sahilan Maldialan Sehr Length 01 km
- Metal and Black Topping of Link Road Upper Sarwar Length 0.5 km
- Metal and Black Topping of Link Road Khari Abbasian Length 01 km
- Metal and Black Topping of Link Road Chetroa Length 01 km
- Metal and Black Topping of Link Road Dhulli/Orabastan Kot Broll Length 0.5 km
- Metal and Black Topping of Link Road Akori House of Chaudhary Saddique (Late) Length 01 km
- Metal and Black Topping of Link Road House of Fittat Kotery/House of Bilal Manzoor Chowki Length 0.5 km
- Metal and Black Topping of Link Road Mahaj Camp Huda Baari Length 01 km
- Metal and Black Topping of Link Road House of Rafaqat Shah Bhout Length 600 Ft
- Metal and Black Topping of Link Road House of Malik Asfar Gugar Bun Length 0.5 km
- Metal and Black Topping of Maharian House of Javed/House of Chaudhary Aziz Raikat Length 0.5 km
- Metal and Black Topping of Link Road Hallar/Mughal Mohallah Khullar Length 0.5 km
- Metal and Black Topping of Link Road House of Mumtaz Length 01 km
- Metal and Black Topping of Link Road Roy Gali Chaudhary Mohallah Length 0.5 km
- Metal and Black Topping of Link Road Kiani Mohallah Length 0.5 km
- Metal and Black Topping of Link Road Jandallan Upper Sec Length 0.5 km
- Metal and Black Topping of Link Road House of Chairman Salik (Late) Chatter Length 0.5 km
- Metal and Black Topping of Link Road Upper Swanj Near House of Babar/Khan Mohallah Length 0.5 km
- Metal and Black Topping of Link Road Raiya By Pass/House of Abdul Wahab Bhary Length 01 km
- Metal and Black Topping of Link Road Charli Bun Sammi Length 01 km
- Metal and Black Topping of Link Road Kathi House of Subedar/Sukhi Baa 0.5 km and House of Chaudhary Riaz (Late) Seri Gala 0.5 km Total Length 01 km
- Metal and Black Topping of Link Road Choudhary Shoukar Dhak Length 0.5 km
- Metal and Black Topping of Link Road Nazar Pur to Sheikh Mohallah Length 0.5 km
- Reconstruction of Link Road Gale Gali Length 01 km
- Reconstruction of Link Road Sofy to Kotla Length 01 km
- Reconstruction of Link Road Dhulli Section Length 02 km
- Reconstruction of Link Road Raira Section Length 02 km
- Reconstruction of Link Road Bagh Section Length 02 km
The scope includes supply of materials, site preparation, and black topping as per technical specifications. The contract period is 730 days for each lot. Bidders must be registered with PEC in category C-5 or C-6 as specified per lot and have valid FBR/ATL registration. Earnest money and bid security as per rules must be submitted. Bidding documents and instructions are available on the Contractor's E-Bidding Dashboard and the Executive Engineer PWD Highways Division Bagh website.
The deadline for submission and opening of bids is **26-10-2026 at 11:30 AM**. Bids must be submitted electronically via the e-bidding system. Interested bidders should ensure their electronic bids are complete and submitted on time. Late or incomplete bids will be rejected. The competent authority reserves the right to reject any or all bids as per AJK PPRA rules.
A practical tip for bidders: Carefully review the detailed bidding instructions and ensure your bid security deposit is properly submitted to the specified Divisional Joint Account along with all required documents to avoid disqualification.
