WhatsApp Chat
🎁 New Users: 1 MONTH FREE TRIAL — Koi Payment Nahi, Full Access! 📱 WhatsApp Karein

Providing and Laying Water Supply Scheme Including Bore and Surface Tank at Abdul Karim Chandio Village, UC Girnar, Thatta

📌 Tender No: Dated: ________________ Contract Value: 1,550,000 (M)
Expired Tender
⏰ Closing Date:
2026-04-07

Tender Description

This tender invites qualified contractors in Thatta to execute a comprehensive water supply scheme including borehole drilling and construction of a surface tank at Abdul Karim Chandio Village, UC Girnar. Issued by the District Council Thatta, this project falls under construction, plumbing, and electrical categories, reflecting the multidisciplinary nature of the work. The scope covers excavation, concrete works, masonry, pipe laying, and installation of electrical motors and valves. The site requires careful handling of earthworks and concrete structures, with precise alignment and finishing as per engineering specifications. The project demands expertise in reinforced cement concrete, steel reinforcement fabrication, and plumbing installations using uPVC pipes. The location in Thatta presents typical regional challenges such as soil variability and water table considerations, requiring contractors to plan accordingly. Bidders must hold a valid PEC registration in the relevant category and maintain compliance with FBR and Sindh Revenue Board registrations. The tender emphasizes adherence to the 2025-26 fiscal year requirements, including valid NTN, professional tax certificates, and electrical licenses. Firms must demonstrate at least five years of experience, a turnover between 2 to 4 million PKR, and provide affidavits confirming no litigation or blacklisting. These conditions ensure only capable and compliant contractors participate. Submission deadline is set for 07-04-2026 at 2:00 PM, with bid opening at 2:30 PM at the Office of the District Engineer, District Council Thatta, Makli. Bidders should submit sealed hard copies of their bids, including technical and financial proposals, along with the required bid security and documentation. Pro-Tip: Carefully review the bid security requirements and ensure the Call Deposit Receipt (CDR) is prepared as per the specified 5% of the estimated cost. Missing or incorrect bid security is a common cause for disqualification, so double-check all financial guarantees before submission.
🔒

Full Tender Details for Subscribers

Subscribe to unlock complete information for every tender on Daily Tender Alert.

  • Issuing Authority & Tender No.
  • Estimated Cost & Budget
  • Procurement & Submission Method
  • Official Contact & Website
  • Download Tender Document (PDF)
  • Full Tender Description & Pro-Tips
  • Category-wise Email & WhatsApp Alerts
  • Province-wise & City-wise Alerts
  • Daily WhatsApp Group Access
View Plans & Subscribe
Scroll to Top