0 Trusted Subscribers
0 Tenders Listed
Daily Updates
Addition of 02 Nos. 220kV Line Bays at Existing 220/132kV Grid Station Daharki
Tender No: XEN-S&I-EHV-II-RYK-01-2026-27
Expired Tender
Closing Date:
2026-08-24
2026-08-24
Tender Overview
- Category
- Construction & Civil Works / Electrical Works & Equipment
- Sector
- Works
- Tender Type
- Works
- Procurement Method
- National Competitive Bidding (NCB) through Single Stage Two Envelope (SSTE)
- Submission Method
- Electronic submission through EPADS only; bid security must be submitted to the Executive Engineer EHV-II S&I Division, NGC, 132 KV Grid Station, Shahbazpur Road, Rahim Yar Khan.
- Source Name
- PPRA
Location & Dates
- City
- Rahim Yar Khan
- Province
- Punjab
- Country
- Pakistan
- Publish Date
- 2026-08-06
- Closing Date
- 2026-08-24
- Created At
- 2026-08-06 19:57:05
Contact & Websites
- Contact Person
- Executive Engineer (S&I), EHV-II, NGC, Rahim Yar Khan
- Contact Phone
- 068-9330007; +92-3357401960
Actions
Download Tender Document
Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Upgradation and Rehabilitation of Lavatories and Common Washrooms at Tahira, Khadija/Science, and...
Close: 2026-10-08 Rawalpindi, Punjab
Construction of Additional Room & Kitchen and Bath Room & Store Room...
Close: 2026-10-13 Rawalpindi, Punjab
Improvement/Rehabilitation of Peshawar Sports Complex (Qayyum Stadium)
Close: 2026-10-14 Peshawar, Khyber Pakhtunkhwa
Provision of Certain Facilities at PAF Multan (Eight Lots)
Close: 2026-09-26 Multan, Punjab
Fabrication and Supply of Solid Waste Machinery for Tehsil Municipal Officer TMA...
Close: 2026-10-12 Dara Adam Khel, Khyber Pakhtunkhwa
Provision of Certain Facilities at Multan Garrison for Financial Year 2026-27
Close: 2026-09-30 Multan, Punjab
Tender Document
Tender Description
National Grid Company (NGC) of Pakistan invites eligible contractors to submit bids for the addition of two 220kV line bays at the existing 220/132kV Grid Station Daharki. The project covers complete civil works, transportation, erection or installation, testing, and commissioning under NGC own resources. The works are to be coordinated through the Executive Engineer EHV-II S&I Division, NGC, Rahim Yar Khan.
The mandatory scope and estimated quantities include: Lot 1, one lot for clearing and grubbing; 6,000 cubic metres of borrow fill and 2,000 cubic metres of excavated foundation fill; 220kV equipment and gantry foundations comprising 19 post insulator foundations, 4 circuit breaker sets, 21 CT/CVT/CCVT/LT foundations, 6 surge arrester foundations, 10 bus or line isolator sets, 8 high-level gantry foundations, 4 foundations of the 13+5.5+4 metre type, and 4 foundations of the 13 metre type. Cable trenches include Type A 100 linear metres, Type B 300 linear metres, Type C 150 linear metres, and Type D 120 linear metres, plus culverts, draw pits, a 150 linear metre PCC road, 250 linear metres of RCC pipes, and PVC conduits of 1,000, 500, and 250 linear metres. River-run gravel is 850 cubic metres. Extra BOQ items include 500 cubic metres excavation, 150 cubic metres each of lean concrete and RCC, 2,000 kilograms reinforcement steel, 125 cubic metres brickwork, 500 square metres plaster, and 20 platforms. Electrical scope includes four circuit breakers, ten isolators, twelve CTs, nine CVTs, six surge arresters, nineteen post insulators, busbars, strain buses, shield wire, gantries, earthing, lighting, fire extinguishers, and commissioning.
Bidders must hold relevant PEC licensing, be prequalified or enlisted where required, appear on the Active Taxpayers List, and not be blacklisted. Submit the required **2% bid security**, qualification evidence, financial statements, experience certificates, integrity documents, and EHS undertakings. Pre-bid meeting: **2026-08-19 at 11:30**. Submit the electronic bid through EPADS only by **2026-08-24 at 11:00**; deliver bid security to the Rahim Yar Khan office by the same deadline. Technical bids open on EPADS at **2026-08-24 11:30**. Completion is 180 days from commencement or 30 days after final approved shutdown, whichever is later. Practical tip: inspect the live-substation site and verify all BOQ quantities, shutdown constraints, transport routes, and PEC category before pricing.
