WhatsApp Chat
🎁 New Users: 7 DAYS FREE TRIAL — Koi Payment Nahi, Full Access! 🚀 Free Account Banayein

C.C Paver and Drainage at Village Gul Mohammad Samoo, Shabir Samoo, Hassan Samoo Taluka and District Thatta

Tender No: PHE/TC/1847/2026
Expired Tender
Closing Date:
2026-07-20

Tender Document

Tender Description

The Public Health Engineering Division Thatta is procuring works for C.C Paver and Drainage at Village Gul Mohammad Samoo, Shabir Samoo, Hassan Samoo Taluka and District Thatta. This tender invites experienced contractors to undertake comprehensive construction and drainage works in Thatta district, Sindh. Items being procured: - Open Surface Drain excavation and construction - Cement Concrete Plain work - Pucca brick work in foundation and plinth - Cement plastering - Construction of Standard Open Drains with concrete blocks - R.C.C work including reinforcement - Excavation and laying of pipeline including RCC pipes - Construction of manholes and inspection chambers - Refilling of excavated trenches - C.C Paver works including earth excavation, compaction, concrete plain, edging, and paving blocks - Cartage of materials The technical scope includes excavation, concrete works, brickwork, plastering, pipeline laying, manhole construction, and paving block installation. The site is located in Thatta district, requiring adherence to local standards and specifications. The contractor must have PEC registration in relevant categories (C-5, C-6, CE-09, CE-10, EE-11, ME-09), valid FBR and SRB registration with active taxpayer status, ISO certifications, and proven experience in water supply and drainage schemes. Financial capacity must demonstrate turnover of at least 80% of the estimated cost. The contract duration is 180 days with a liquidated damages clause of 0.05% per day up to 10% of contract value. Key dates include the tender publication on 2026-07-02 and bid closing on 2026-07-20 at 12:30 PM. Bids must be submitted in person or by registered mail to the Office of the Executive Engineer Public Health Engineering Division Thatta, Near Session Court & SP Office Makli District Thatta. The bid opening will be held on the same day at 1:00 PM at the same venue. A practical tip for bidders: Ensure all mandatory documents including PEC registration, FBR/SRB certificates, ISO certifications, and audited financial statements for the last three years are complete and attested. Partial or incomplete submissions will be rejected. Also, prepare a detailed technical proposal with evidence of similar completed works and available machinery to score well in technical evaluation.
🔒

Full Tender Details for Subscribers

Subscribe to unlock complete information for every tender on Daily Tender Alert.

  • Issuing Authority & Tender No.
  • Estimated Cost & Budget
  • Procurement & Submission Method
  • Official Contact & Website
  • Download Tender Document (PDF)
  • Full Tender Description & Pro-Tips
  • Category-wise Email & WhatsApp Alerts
  • Province-wise & City-wise Alerts
  • Daily WhatsApp Group Access
7 Days Free Account Banayein View Plans & Subscribe
Scroll to Top