Ditching, Backfilling and Affliction Works for SOG to Smart City Venture Housing Scheme R.S # 72 Deh Bugti Block Taluka & District Larkana
📌 Tender No: SSGC / SC / 14309
Expired Tender
⏰ Closing Date:
2026-05-04
2026-05-04
Tender Overview
- 📂 Category
- Construction & Civil Works
- 🏭 Sector
- Works
- 📄 Tender Type
- Works
- ⚙️ Procurement Method
- Single Stage One Envelope Bidding Procedure
- 📨 Submission Method
- Online via EPADS portal
- 🌐 Source Name
- PPRA
Location & Dates
Contact & Websites
- 📞 Contact Phone
- 99231583
- ✉️ Contact Email
- mnte@ssgc.com.pk
- 🌐 Website
- www.ssgc.com.pk
- 🔗 Original Source
- www.ppra.org.pk
Actions
📥 Download Tender Document
🔗 View Original Advertisement
⬅️ Back to All Tenders
Looking for more tenders like this? View all active Construction & Civil Works tenders.
Related Tenders
Installation of Water Filtration Plant and Drainage Repair at Noor Mustafa Madarsa...
Close: 2026-07-08 Kandhkot, Sindh
Construction and Cleaning of Sewerage Lines and Manholes in Manghopir Town Karachi
Close: 2026-07-13 Karachi, Sindh
Partition and Electrical Works in MDDC Building for ICT Directorate at NUST...
Close: 2026-07-08 Islamabad, Islamabad Capital Territory
Replacement of Floor Tiles at 4th Floor Terrace, Office Building GSL
Close: 2026-07-06 Lahore, Punjab
Replacement of Roof Canopy (Poly Carbonate Sheet) with Installation for RHO Complex
Close: 2026-07-06 Lahore, Punjab
Construction of Mumty's and Granite Skirting at Gaddafi Stadium Lahore
Close: 2026-07-06 Lahore, Punjab
Tender Document
Tender Description
Sui Southern Gas Company Limited (SSGCL) is procuring ditching, backfilling and affliction works specifically for the SOG to Smart City Venture Housing Scheme R.S # 72 Deh Bugti Block Taluka & District Larkana. This tender involves excavation of trenches for laying 63mm and 125mm Polyethylene (PE) gas pipelines over a total length of 2144 meters. The scope includes laying PE gas pipelines with soft padding and cushioning, backfilling trenches, and ensuring proper site safety and material handling as per the Bill of Quantities (BOQ).
The technical scope covers excavation, backfilling, provision of soft sand cushioning, pipe stringing, and repair of any underground utilities damaged during excavation. The contractor is responsible for site supervision, safety, and coordination with local authorities. The work must comply with company HSE policies and be completed within the stipulated time frame. The contractor must have a valid PEC certificate Category C-5 or above with specialization CE-08, FBR registration, and relevant experience in similar pipeline works.
Bids must be submitted online via the EPADS portal by 04-May-2026 at 12:00 hours. The technical and financial proposals should be submitted in separate sealed envelopes under the Single Stage Two Envelope Bidding Procedure. A fixed bid bond of PKR 36,000 in the form of pay order or demand draft in favor of Sui Southern Gas Company Limited is mandatory. The bid validity period is 90 days from the bid opening date.
A practical tip for bidders is to thoroughly inspect the work sites and understand local conditions before submitting bids. Submission of the bid shall be prima facie evidence that the bidder has fulfilled this requirement. Ensuring all documents are signed, stamped, and submitted correctly on EPADS will avoid rejection. Early registration on EPADS and confirmation of bid submission by fax to the General Manager (Procurement) is recommended to ensure compliance with tender requirements.
