Supply and Integration of Flow Meters with SCADA System for Golain Gol Hydropower Station Units 1-3
Tender No: RE/GGHPS/ITRE/24-25(01)
Expired Tender
Closing Date:
2026-01-20
2026-01-20
Tender Overview
- Category
- Solar & Power Equipment
- Sector
- Goods
- Tender Type
- Goods
- Procurement Method
- Single stage, single envelope
- Submission Method
- Online portal
- Estimated Cost
- PKR 254000
- Source Name
- PPRA
Location & Dates
- City
- Chitral
- Province
- Khyber Pakhtunkhwa
- Country
- Pakistan
- Publish Date
- 2026-01-02
- Closing Date
- 2026-01-20
- Created At
- 2026-01-02 10:14:02
Contact & Websites
- Contact Person
- Resident Engineer (O&M) GGHPS WAPDA Koghuzi Chitral
- Contact Phone
- 0943-477024
- Contact Email
- itrgghps@gmail.com
- Website
- www.eprocure.gov.pk
- Original Source
- www.eprocure.gov.pk
Actions
View Original Advertisement
Back to All Tenders
Looking for more tenders like this? View all active Solar & Power Equipment tenders.
Related Tenders
Procurement of Local AP Network Components, Etological Safety Cabinet & Autoclave, Renovation/Paint...
Close: 2026-09-02 Islamabad, Islamabad Capital Territory
Providing and Fixing Solar Street Lights in Various Locations of Taluka Samaro...
Close: 2026-08-28 Umerkot, Sindh
Supply of Solar Energy System for DWSS in Deserving Communities in District...
Close: 2026-08-24 Orakzai, Khyber Pakhtunkhwa
Procurement of Solar Plates 180 Watts and Solar Street Lights 500 Watts...
Close: 2026-09-16 Ghotki, Sindh
Supply and Installation of Solar Pumping Machinery and Civil Works for WSS...
Close: 2026-08-25 Panjgur, Balochistan
Installation of High Efficiency Irrigation System, Solar Bore & High Tunnel for...
Close: 2026-08-19 Quetta, Balochistan
Tender Description
This tender invites qualified Original Manufacturers, Authorized Distributors, and Suppliers registered with Income Tax and Sales Tax Departments and listed on the active Taxpayers List (ATL) to supply, install, test, commission, and integrate flow meters with the existing SCADA system for generating units 1 to 3 at Golain Gol Hydropower Station in Chitral. The contract duration is 90 days, emphasizing timely and efficient execution in a challenging mountainous region where precise flow measurement is critical for operational efficiency and safety.
The scope includes the provision of high-quality flow meters compatible with the current SCADA infrastructure, ensuring seamless data integration and real-time monitoring. The site's remote location in Chitral demands robust equipment and expert installation to withstand environmental conditions and maintain system reliability.
Bidders should ensure compliance with PEC categories relevant to electrical equipment supply and installation. Additionally, all participants must be registered with FBR and maintain ATL status for the fiscal year 2025-26. It is advisable to prepare the Call Deposit Receipt (CDR) of PKR 254,000 as earnest money, payable to the Resident Engineer Golen Gol HPS account at UBL Chitral, to meet bid security requirements.
The submission deadline is set for 20th January 2026 at 11:00 AM via the EPADS online portal, with bid opening scheduled at 11:30 AM the same day at the Resident Engineer's office in Koghuzi, Chitral. Manual bids will not be accepted, so bidders must ensure timely electronic submission.
Pro-Tip: Carefully review the EPADS portal for the detailed terms and conditions, especially the notification of the Grievance Redressal Committee (GRC) under PPRA rules, which is often overlooked but crucial for dispute resolution and compliance verification.
