Procurement and Installation of Asset Performance Management System (APMS) for Pole Mounted Distribution Transformers
Tender No: P54248
Expired Tender
Closing Date:
2026-07-17
2026-07-17
Tender Overview
- Category
- Electrical Works & Equipment / Solar & Power Equipment
- Sector
- Works
- Tender Type
- Works
- Procurement Method
- National Single Stage-One Envelope
- Submission Method
- Electronic Submission via EPADS v2.0
- Estimated Cost
- Rs. 282,177,795.00
- Source Name
- PPRA
Location & Dates
Contact & Websites
- Contact Person
- Assistant Manager Procurement
- Contact Phone
- +92-319-975-7793
- Contact Email
- amproc&dist@mepco.com.pk
- Website
- https://epads.gov.pk/opportunities/federal/procurements/54248
- Original Source
- https://epads.gov.pk/opportunities/federal/procurements/54248
Actions
Download Tender Document
View Original Advertisement
Back to All Tenders
Looking for more tenders like this? View all active Electrical Works & Equipment tenders.
Related Tenders
Annual framework contracts for provision, supply, repair, and purchase of various items...
Close: 2026-08-12 Gujrat, Punjab
Hiring Entertainment Items and Catering Services, Repair and Maintenance of AC and...
Close: 2026-08-12 Lahore, Punjab
Procurement of Air and Water Gun for CSSD
Close: 2026-08-11 Lahore, Punjab
Annual Framework Contracts for Provision, Supply, Repair, and Purchase of Various Items...
Close: 2023-08-19 Gujrat, Punjab
Construction and Completion of Civil Works, Erection, Stringing, Testing and Commissioning of...
Close: 2026-08-04 Sheikh Muhammadi, Khyber Pakhtunkhwa
Procurement of Spares for TTBS Vehicles and Filters
Close: 2023-11-01 Karachi, Sindh
Tender Document
Tender Description
The Multan Electric Power Company (MEPCO) is procuring and installing an Asset Performance Management System (APMS) for pole mounted distribution transformers in Multan, Punjab. This procurement covers 1341 units of APMS for transformers ranging from 25 kVA to 630 kVA, including associated accessories and integration with Head-End System (HES) and Meter Data Collection (MDC) systems as per PPMC Specification No. PPMC-DS-01:2026.
The scope includes supply, installation, testing, commissioning, and integration of APMS equipment on distribution transformers for transformer level monitoring, protection, load management, energy auditing, and remote operation. The system features smart metering and controlling devices, current transformers, molded case circuit breakers (MCCB), magnetic contactors, and optional oil temperature and level monitoring sensors. The installation must be completed within 60 days from the issuance of the work order.
Eligible bidders must have valid PEC registration for electrical works, FBR registration, and an average annual turnover of at least PKR 120 million over the last three years. Prototype approval as per PPMC standards is mandatory. Bidders must comply with all technical specifications, provide bid security, and submit bids through the EPADS v2.0 platform.
The tender submission deadline is Friday, July 17, 2026, at 11:00 AM, with bid opening at 11:30 AM on the same day via EPADS. Manual submissions are not accepted. The bid security must be submitted in the form of pay order, banker's cheque, call deposit, or bank guarantee. The contract will be awarded based on Least Cost Based Selection (LCBS). The successful bidder will provide a 5% performance guarantee and warranty for five years covering all components.
A practical tip for bidders is to ensure timely registration on EPADS v2.0 and to carefully prepare the technical bid with all required documentation, including prototype approvals and financial statements, to avoid disqualification. Early site visits and coordination with MEPCO field staff are recommended to verify transformer ratings and installation conditions before bidding.
