Procurement and Installation of IT Equipment and Solar Power System
📌 Tender No: ___142___ /Tender/Scj/Admin/KK
Active Tender
⏰ Closing Date:
2026-06-02
2026-06-02
Tender Overview
- 📂 Category
- IT & Computer Equipment / Solar & Power Equipment
- 🏭 Sector
- Goods
- 📄 Tender Type
- Goods
- ⚙️ Procurement Method
- Single Stage Two Envelope Procedure
- 📨 Submission Method
- Online via EPADS with physical submission of 2% CDR
- 🌐 Source Name
- Khyber Pakhtunkhwa PPRA
Location & Dates
- 📍 City
- Karak
- 🗺️ Province
- Khyber Pakhtunkhwa
- 🌍 Country
- Pakistan
- 📅 Publish Date
- 2026-05-19
- ⏳ Closing Date
- 2026-06-02
- 🕒 Created At
- 2026-05-19 07:06:28
Contact & Websites
- 👤 Contact Person
- Aziz Ahmad Senior Civil Judge Admin Karak Chairperson Purchase Committee
- 📞 Contact Phone
- 0927-291001
- ✉️ Contact Email
- scj_admnkarak@outlook.com
- 🌐 Website
- http://www.kppra.gov.pk/kppra/activetenders
- 🔗 Original Source
- http://www.kppra.gov.pk/kppra/activetenders
Actions
📥 Download Tender Document
🔗 View Original Advertisement
⬅️ Back to All Tenders
Looking for more tenders like this? View all active IT & Computer Equipment tenders.
Related Tenders
Supply and Installation of Solar System, E-library Equipment and Water Filtration Plant...
Close: 2026-06-09 Bannu, Khyber Pakhtunkhwa
Supply Installation Commissioning of IT Networking Infrastructure and Equipment
Close: 2026-06-04 Peshawar, Khyber Pakhtunkhwa
Procurement of Miscellaneous Items and Solarization at University of Shangla
Close: 2026-06-09 Shangla, Khyber Pakhtunkhwa
Procurement of IT Equipment, Plant Machinery, and Furniture for District & Sessions...
Close: 2026-06-04 Timergara, Khyber Pakhtunkhwa
Procurement of Plant Machinery, Hardware, IT Equipment, Office Stationery and Furniture
Close: 2026-06-08 Chitral, Khyber Pakhtunkhwa
Supply of Plant, IT Equipment, Stationery and Furniture for Civil Courts Mansehra
Close: 2026-06-06 Mansehra, Khyber Pakhtunkhwa
Tender Document
Tender Description
The District Judiciary Khyber Pakhtunkhwa, Office of the Senior Civil Judge Admin Karak, is procuring and installing a range of IT equipment and a solar power system for the financial year 2025–26. This procurement includes laptops with 13th Generation Intel Core i5 processors, all-in-one computers with touch screens, LED monitors, printers, scanners, and a comprehensive solar PV system including 590 Watt bifacial crystalline solar panels, hybrid inverters, lithium battery banks, mounting structures, earthing systems, and all necessary cabling and breakers. The procurement is specific to Karak and aims to enhance the office's technological and energy infrastructure.
The technical scope covers high-performance computing devices with Windows 11 Pro, advanced display technologies, and peripherals with local warranty. The solar system components must meet KP government standards, including 25-year warranties on panels and 5-year warranties on batteries, with installation adhering to strict voltage drop limits and safety standards. The scope also includes civil works for mounting structures and earthing installations.
Eligible bidders must be well-established firms registered with Sales Tax, Income Tax, and KPPRA departments. They should have relevant experience and provide a manufacturer authorization letter for after-sales services, with a mandatory Peshawar office. The bidding process follows the Single Stage Two Envelope Procedure with technical and financial bids submitted via EPADS. Earnest Money of 2% of the total bid amount in the form of a Call Deposit Receipt (CDR) is required, payable to the Senior Civil Judge Admin Karak.
The deadline for online bid submission is 02-06-2026 at 11:00 AM, with technical bids evaluated the same day at 01:30 PM. A pre-bid meeting is scheduled for 25-05-2026 at 01:30 PM at the Joint Judicial Complex Karak, with video link access available. Bidders should ensure timely physical submission of the 2% earnest money to avoid disqualification.
A practical tip for bidders is to carefully prepare both technical and financial bids in hard form for submission on the opening day, ensuring all required documents including the CDR and manufacturer authorization are complete. This will help avoid common pitfalls such as incomplete bids or late submissions, which are strictly rejected under KPPRA rules.
