WhatsApp Chat
🎁 New Users: 1 MONTH FREE TRIAL — Koi Payment Nahi, Full Access! 📱 WhatsApp Karein

Procurement, Implementation, Configuration, and Support of a Learning Management System for USTP Project

📌 Tender No: P52157
Active Tender
⏰ Closing Date:
2026-07-09

Tender Document

Tender Description

The Ghulam Ishaq Khan Institute of Engineering Sciences And Technology GIKI in Swabi, Khyber Pakhtunkhwa, is procuring a comprehensive Learning Management System (LMS) for the USTP Project. This procurement covers the implementation, configuration, and ongoing support of the LMS platform tailored to meet the needs of multiple departments and training batches simultaneously. The LMS will provide functionalities including online screening and assessment management, user registration with role-based access, course and module management, online quizzes and automated grading, attendance tracking, certificates and badges issuance, announcements, reporting dashboards, and alumni tracking. The system must be web-based, support containerized deployment, scalable for high concurrent users, secure with HTTPS/SSL, and capable of integration with email and notification services. Eligible bidders must have at least three years of relevant experience in deploying and maintaining LMS solutions, possess valid NTN, STRN, and ATL registration, and demonstrate financial soundness. The procurement follows a Quality and Cost Based Selection (QCBS) method with a technical passing score of 60%. Bidders must submit their bids through EPADS v2.0 by the deadline. The submission deadline is **July 9, 2026, 03:00 PM**, with bid opening at 03:30 PM on the same day. Bids must be submitted online via EPADS; manual submissions will not be accepted. The bid security must be submitted in original form to Room F-12, First Floor Admin Block, GIKI, Swabi. A practical tip for bidders is to ensure timely registration on EPADS v2.0 and to prepare a detailed technical bid including a video or live demonstration of the proposed LMS, as this is a critical part of the evaluation. Also, ensure all required documents such as NTN, ATL certificates, and experience proofs are complete to avoid disqualification. The contract includes a maintenance and support period of at least four months post-deployment, after which the LMS becomes the property of GIKI.
🔒

Full Tender Details for Subscribers

Subscribe to unlock complete information for every tender on Daily Tender Alert.

  • Issuing Authority & Tender No.
  • Estimated Cost & Budget
  • Procurement & Submission Method
  • Official Contact & Website
  • Download Tender Document (PDF)
  • Full Tender Description & Pro-Tips
  • Category-wise Email & WhatsApp Alerts
  • Province-wise & City-wise Alerts
  • Daily WhatsApp Group Access
View Plans & Subscribe
Scroll to Top